-
Min. Order (MOQ)
1 Piece(s)
we are offering bldc hub motor test dynamometer. bldc motor performance & endurance test set up, consist various types of dynamometers & control configuration sas manual torque control, plc controlled, pc based data acquisition. bldc motors, as they are compact in size, lighter in weight & most efficient than other electric motors, they are usedas hub motor electric vehicles scooters, electric bicycle, bldc shafted motors for solar power submersiblepumps, sump pumps, for various applications in automotive, aerospace, military, medical, lifts, cranes, elevators, air condition & refrigerator compressors, fans, cleaners- scrubbers, sweepers, lawn movers, trade mills & fitnessequipments & many more applications.
dynamometers employed to test motors are:powder dynamometers, eddy current dynamometers, tandem dynamometers, ac regenerative dynamometers, dc regenerative dynamometers.
our proprietary appsys motor test software developed, using national instruments labview platform, for bldcmotor test, to monitor & display motor electrical input power, mechanical output power, motor efficiency, inputvoltage, current, power factor, motor no load current, full load current, no load & full load speed, no load &full load torque, motor temperature, bearing temperature, winding temperature, etc.pc based motor test set up consist: window xp win7 operating systems, pc hardware & pci data card with necessary digital & analogue inputs & outputs, power analyzer, electrical input power (motor power sensor to sense motor power -to monitor motor electrical input power & for calculation of efficiency) & mechanical output power speed & torque, efficiency are displayed on monitor & stored in tabular form & graphs in ms excel format.pc auto & pc manual mode selector soft push button switch on monitor screen. in pc auto mode, data is captured onpredetermined (site settable) time & torque loading in 100 steps (independently settable), whereas in pc manualmode data is captured manually
Additional Information:
Packaging Details : export and sea worthy
Delivery Time : 3-4 weeks