Versatile Dry Cabinet with features of Humidity Chamber with user friendly options.DUEXoffers dry Jumbo cube with -70 to +90 deg C and 1 to 99% RH setting. Different high strength grade insulation injected with special injecting machine provides uniform PUF distribution.
A number of design variables can come into play when selecting and designing a process cooling system. The following formula commonly is applied.
Q (BTUs) = W x Specific Heat x gT
Where W is the weight of material to be cooled.
Specific Heat is a heat constant taken from tables.
gT is the initial temperature minus final desired temperature.
Note that 1 ton of refrigeration is 12, 000 BTU/hr.