Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    RCC Hume Pipes

    • Length2 & 2.5 meter and as per requirement
    • ClassLight duty- NP2, Medium Duty- NP3, Heavy Duty- NP4
    • DesignDesign of the RCC Hume pipe as per IS - 458/2003 (Fourth revision)
    • JointsSocket and Spigot, Collar Joints and Flush Joints
    • Supply TypeManufacturer, Supplier, Retailer
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 17 Years
    • building Nature of Business Retailer
    • gst icon GST No. 07AACPJ8904A1Z5

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • Length2 & 2.5 meter and as per requirement
    • JointsSocket and Spigot, Collar Joints and Flush Joints
    • DensityOptimum water cement ratio and High density.
    • DesignDesign of the RCC Hume pipe as per IS - 458/2003 (Fourth revision)
    • Diameter Of RCC Hume Pipe80,100, 150. 200, 225,250,300, 350,400,450, 500, 600, 700,800, 900,1000,1100, 1200, 1400,1600 & 1800
    • ClassLight duty- NP2, Medium Duty- NP3, Heavy Duty- NP4

    Our company is capable of delivering consignments on time owing to an efficient trading network we have. Our product is wrapped in industrial grade packaging supplies that are ecological and offer defense to the products against mechanical and transit damage. Furthermore, the product is correctly branded to offer data.
    Hume Pipe Selection and laying guidelines :

    • First understand your site requirements and use of Pipe. Then choose the diameter and type of joints as per the design.
    • Check the quality of Hume pipe at site, thoroughly examine the pipe and ensure that there is no leakage. Simultaneously check the inside Spun pipe surface and ensure smooth finish to minimize the scouring and friction loss.
    • Pipe joints should be fixed properly and on site leakage inspection should be carried out before backfilling the pipes.
    • Before and after  laying of Pipe ensure proper compaction and gradient to prevent any damage due to heavy load after installation. If required, Cement concrete hunching is done.


    Interested in this product? Ask for more details & Latest Price from seller
    Send Enquiry
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for RCC Hume Pipes?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice