Large mass fill concrete base slabs are often used for structural foundations, during curing of these high volumes of concrete great care must be taken to ensure the mix design is such that the exothermic reaction does not exceed permissible limits across the whole cross-section of the base slab. A series of thermocouples are installed at various depths to ensure strict control the temperature is maintained whilst the concrete is curing.