My ExportersIndia

For Buyer

For Seller

For Help

MA

Manar Al Omran
location Damman, United Arab Emirates

Write a Review

Laminated Panels

We offer the best product range of Early Striking:.

Early Striking:

This system incorporates the concept of earlier striking, which enables removal of the slab formwork along with decking beams and infill (or, decking panels) while leaving the vertical support in position for the requirement longer duration. Drop head enables the early striking. This system is compatible for use with tubular scaffold staging or telescopic props with compatible load carrying capacity and stability criteria as per requirement.

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us