My ExportersIndia

For Buyer

For Seller

For Help

Our Products

  1. Clean Room Equipment 7 Products available
  2. Generators 4 Products available
  3. Pass Box 4 Products available
  4. Ultrasonic Fogger 2 Products available
  5. Modular Cleanrooms 2 Products available
  6. Laboratory Ovens 2 Products available
  7. Laboratory Bath 2 Products available
  8. Window 1 Products available
  9. Repair & Maintenance Services 1 Products available
  10. Surgical Scrub Sink 1 Products available
  11. AIR Purifiers 1 Products available
  12. Laboratory Equipments 1 Products available
  13. Laboratory Hood 1 Products available
  14. HVAC System 1 Products available
  15. Control Panels 1 Products available
  16. HVAC AIR Filter 1 Products available
  17. Fire Doors 1 Products available
  18. Filters 1 Products available
  19. Commercial Door 1 Products available
  20. Carbon Filters 1 Products available
  21. Doors 1 Products available
  22. Cassette AIR Conditioner 1 Products available
  23. AIR Handling Unit 1 Products available
  24. Lab Incubator 1 Products available
  25. Scientific Instruments 1 Products available

AIR Handling Unit

We are leaders in the market for providing best range of Air Handling Unit

Air Handling Unit

1.90 Lakh / Piece Get Latest Price
  • Min. Order (MOQ) 1 Piece
  • Driven Type Electric
  • Application Industrial
  • Size Standard
  • Certification CE Certified
  • Country of Origin 220V
  • Number Of Flower Single Skin
  • Total Carbohydrate 1year
  • Country of Origin India
  • Capacity 1000 CFM

Air handling equipment shall be manufactured in accordance with the following specification, designed for horizontal or vertical air flow. Units shall be matching in both internal width and height to ensure smooth efficient air movement through each section of plant with minimum turbulence and pressure loss. Access shall be provided to each section of plant for inspection and maintenance purposes. Units shall be constructed to eliminate the transmission of mechanical vibration. For ease of handling, larger units shall be transported to site in sections for assembly by others. All jointing gaskets, sealing materials and hardware shall be provided to allow assembly to be completed. Suitable permanent lifting points shall be incorporated into the unit base frame or framework. The units shall be complete with fixed identification, airflow and warning labels. As a minimum the AHU shall be constructed to meet the leakage requirements of DW143 class B (BS1886 leakage class L2)

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us