Post Buy Requirement
AP
Patna, Bihar, India
Verified Add Review

Our Product / Services

  1. Laboratory Apparatus 4 Products available
  2. Fountains & Fountain Accessories 9 Products available
  3. Cabinets & Enclosures 4 Products available
  4. Filters 13 Products available
  5. Industrial & Engineering Products 3 Products available
  6. Valves & Valve Fittings 6 Products available
  7. Foot Light 3 Products available
  8. Others 64 Products / Services available

Cabinets & Enclosures #3016530

Membrane Housing (4.0"E)

Membrane Housing (4.0"E) that we export and supply is designed for continuous and long term use as housings for membrane filtration. Our Membrane Housing is used to treat tap, brackish & sea waters. Our Membrane Housing can accommodate any standard 4 Inch nominal diameter & 40 Inch long spiral wound membrane with ease. In case of female membranes only, membrane interface adapters will be required, which will be supplied along with the housing.

 

User's Guide : Guidelines & Information incorporated in this User’s Guide are intended only as a supplement to good industrial practices. The guide should be used in combination with Engineering Drawing of respective membrane housing model used.

Material Receipt : On receipt, ensure that all the material is received as per ordered qty & in good condition. For any shortages in receipt, intimate the supplier within the stipulated time to void the warranty & in case of transit damages, intimate the concerned insurance agency.

Handling : Membrane housing shell is made of fiber glass & any impact, scratches or mishandling during unloading / loading will reduce the life or make the membrane housing unfit for usage. Ensure that membrane housing packing is intact till the installation.

Installation : Ensure that the installation engineer reads the user guide in detail, before installation. In case of any difficulty, contact the nearest Aquanomics representative.Good industry practices & plumbing / piping codes have to be followed during installation, operation & maintenance in order to assure safe, optimum & long service life of membrane housing. Improper installation can result to catastrophic failure & may result in severe bodily harm or property damage.

Quick Checks : Polyurethane or rubber saddles should be used as an interface between the membrane housing shell & skids / frame.Under pressure, membrane housing must be free to expand. Ensure that flexible fittings & couplings are used to allow expansion. Vessel must not be subjected to excessive stress caused by bending moments. Vessel ports & components should not be used to support piping manifolds or any other components.

Aquanomics 4 Inch Membrane Housing – User’s Guide : Water Leaks Any water leaks from vessel / piping during installation / commissioning should be arrested immediately in order to keep the end plugs & retaining rings clean, dry & free from corrosion. Failure to do so can lead to catastrophic failure & may result in severe bodily harm or property damage.

Special Requirement : Aquanomics provides engineering assistance in selecting appropriate membrane housing & specialty steel for specific applications. Get in touch with your nearest Aquanomics representative. However, the final determination including the evaluation of the construction materials for use in specific environment will be the responsibility of the purchaser.


Precautions : For safer & better service life of membrane housing, follow all the precautionary instructions given below. Failure to do so will void the warranty.

 

Mounting :- Mount the membrane housing centered on horizontal members spaced at recommended span (s) using compliant mounting hardware furnished.

 

Tighten the straps – Maximum one ft-lb.

 

Piping :- Use flexible piping / victaulic couplings for permeate & feed / concentrate connections. Hanging piping manifolds or supporting other components with the membrane housing may result in damaging of membrane housing. Permeate port is made of Engineering Plastic & Tightening the permeate port more than one turn past hand tight will damage the port.

 

Overpressure Protection :- Provide overpressure protection for membrane housing set at not more than 105% design operating pressure.

 

Inspection :- Inspect end closures regularly, replace deteriorated components and correct causes of deterioration.

 

Servicing :- Relieve system pressure before working on the membrane housing. Working on system under pressure may result in severe bodily harm or property damage.

 

Before Start – Up :- Ensure that the retaining ring is in place and fully seated in the groove.

 

Pressures :-

  • Operating the vessel in excess of the ratings, will shorten the life & may result in severe bodily harm or property damage.
  • Engineering permeate port are designed to operate at 125psi, operating at pressure in excess of 125psi must be approved by factory.

 

Aquanomics 4 Inch Membrane Housing – User’s Guide
Membrane Housings are not designed for Vacuum conditions; operate only in positive pressure applications.

 

pH Operation :- Membrane Housings are designed for continuous operation at a pH of 3 – 11 & for intermittent cleaning pH 2 –12 for less than 30 minutes.

 

Stoppage :- Some feed waters may cause corrosion under static condition, in order to prevent the system from corrosion, it is recommended to flush the system with permeate water.

 

Engineering : Ensure that the operator / Engineer who carries out the servicing / maintenance schedule has good knowledge of plumbing, hydraulics, membranes, water treatment & good industry practices.

 

Removing the End Plug :

  • Relieve the membrane housing of system pressure.
  • Disconnect the feed / concentrate
  • & permeate piping. Mark i
  • dentification on the piping
  • assembly for easy re-assembly.
  • Remove all contaminants & foreign matter from end margin of the membrane housing, using a scotch-brite, sand paper or brush. Any contaminants interfering with the end plug removal will damage the end plug or I.D of membrane housing.
  • Remove the retaining ring out of the shell / insert ring groove. Continue removing the ring by running your finger behind the ring & carefully pulling the ring from the groove.Take care not to get the finger injured. In case if it is difficult to remove the retaining ring due to prolong use, in such case lightly tap the end plug using a plastic mallet or use any releasing spray for quick & easy removal.
  • Connect threaded Engineering Plastic nipple to the permeate port and gently rock the end plug up & down to release the end plug from the shell. Repeat the above steps to remove the end plug from opposite side.
  • If the end plug is with adapter design, remove the adapter by slowly pulling on the adapter body.

 

Aquanomics  4 Inch Membrane Housing – User’s Guide Closing the End Plug :

  • Check the bore of the membrane housing for any foreign matter or imperfections. Remove all the foreign matter using mild soap solution and rinse with clean water. For imperfections, using a 600 grit sand paper lightly sand the surface & clean with soap water & rinse with clean water.
  • Lubricate all the seals (pwt/ adapter / head) using silicone based lubricant or commercially available glycerin. Apply a very thin layer of lubricant on the seal area of the membrane housing I.D for ease in closing the end plug.Note : Check with your membrane supplier before using the lubricants as they can foul the membranes.
  • If the end plug is with adapter design, insert the adapter in the end plug by slowly pushing in the permeate port tube. Holding the end plug square to the axis of the shell, slowly push the end plug into the shell until the retaining ring groove is clearly visible.
  • Place the end of the retaining ring in the groove of the shell / insert ring & continue pushing the ring counter-clockwise till the ring completely seats into the groove.
  • Reconnect the feed / concentrate & permeate piping.
  • Double check the assembling of end plugs, retaining ring seating in the groove, piping connections etc before pressurizing the system. Take all the necessary safety precautions before start-up.
  • Do not tolerate any leaks. Leaks can lead to corrosion that can lead to component deterioration & eventually catastrophic failure.


Membrane Loading / Un–loading :
Note : Procedure described below is only for information purpose. Membranes should be loaded / un-loaded according to the membrane manufacturer’s instructions. If membranes are not installed properly, malfunctioning of system /membrane damage may occur.

  • As described in End Plug removal section, remove the End Plugs.
  • For unloading the membranes, push the membranes out of the vessel from the upstream end (feed end). Note: Membranes are always removed & installed in the direction of feed flow.
  • While loading the membrane, ensure that the membrane housing bore & membrane outer surface is perfectly clean & contamination free.
  • Lubricate the seals as per manufacturer’s recommendations.
  • Reinstall the end plug on the down stream end as described in End Plug Closing section.
  • Load the membrane with the brine seal (typically a U-cup seal) installed on the up-stream end with it slip facing up-stream.
  • Push the membrane in the housing until the membrane fully engages with the  head on the down stream end.
  • Once membrane is loaded, close the end plug on the up-stream end.

 

Inspection & Overhaul :
Once the end plug is removed, dismantle the end plug & separate all the components. Clean all the components with soap water, scotch brite & rinse with clean water. Inspect all the components & shell for any corrosion, dents, cracking, softening, discoloring, imperfection, scratches etc.

 

Plastic (Engineering Thermoplastic) Components :-

  • Cracks & Chip-Off – Replace the components.
  • Softening & Dis-Coloring – Can be due to chemical attack, replace the components, if problem continuous check for alternate material.
  • Damaged Threads – Replace the components.

 

Metal Components :-

  • Dents & Sharp Edges – Using sand paper polish the damaged area, if the problem can be rectified use it or else replace the components.
  • Corrosion – Can be due to non compatibility of water & metal composition or due to chemical attack. Replace the components & if the corrosion continuous check with factory for alternate material.

 

Shell :- Check the bore of the membrane housing for any foreign matter or imperfections.Remove all the foreign matter using mild soap solution and rinse with clean water. For imperfections, using a 600 grit sand paper lightly sand the surface & clean with soap water & rinse with clean water.

Note :-

  • If any component cannot be restored to working /as new condition, replace the parts.
  • Use of damaged components can lead to catastrophic failure.
  • Every time the vessel is serviced, replace used seals with new ones.
View Complete Details

Membrane Housing (8.0"E)

The company is the noteworthy Exporter and Supplier of durable Membrane Housing (8.0"E) procured from the reliable sources. Our Membrane Housing is accredited for its sturdy construction, smooth operation, easy installation and longer service life. We make available bulk quantities of Membrane Housing at very affordable rates. In addition, with the help of our fast transit facilities we are able to deliver the orders within the promised time frame.

Our Range :

  • A8E300 Sales Drwg (8 Inch EE 300 psi) 8.0"E Membrane Housing
  • A8E450 Sales Drwg (8 Inch EE 450 psi) 8.0"E Membrane Housing
  • A8E600 Sales Drwg (8 Inch EE 600 psi) 8.0"E Membrane Housing
  • A8E1000 Sales Drwg (8 Inch EE 1000 psi) 8.0"E Membrane Housing
  • A8E1200 Sales Drwg (8 Inch EE 1200 psi) 8.0"E Membrane Housing
View Complete Details

Membrane Housing (8.0"S)

Membrane Housing (8.0"S) that we export and supply is extensively in demand amongst buyers. We procure Membrane Housing from the most reliable manufacturers and vendors present in the market. Moreover, our Membrane Housing is stringently checked on all quality parameters to ensure delivery of only defect-free range at buyer’s end. Obtain from us, bulk quantities of Membrane Housing at market leading rates.

Our Range :

  • A8S300 Sales Drwg (8 Inch SE 300 psi) 8.0" S Membrane Housing
  • A8S450 Sales Drwg (8 Inch SE 450 psi) 8.0" S Membrane Housing
  • A8S600 Sales Drwg (8 Inch SE 600 psi) 8.0" S Membrane Housing
View Complete Details

Membrane Housing (2.5"E)

Ours is the name involved in the exporting and supplying of efficient Membrane Housing (2.5"E) procured from the reliable manufacturers and vendors. Membrane Housing that we offer is especially designed for providing continuous and long term functionality as housing for membrane filtration. It is used for treating tap & low brackish waters. Our Membrane Housing can accommodate any standard 4 Inch nominal diameter & 40 Inch long spiral wound membrane with ¾” dia male product water tube with ease.

Specifications :

  • Design Operating Pressure : 250 PSI (17.2 Bar)
  • Max Operating Temperature : 49oC (120o F)
  • Min Operating Temperature : -07oC (20oF)
  • Hydro - Test Pressure : 375 PSI (25.8 Bar)
  • Qualification Burst Pressure : 1500 PSI (103.4 Bar)

Download


Download Detail File : Click Here
View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us

  • Mr. Shashi Bhushan (Aqua Pools & Spa Co.)
  • Flat No. 602, Sudama Janki Lalan Apartment, Ranjan Path, Abhiyanta Nagar, Bailey Road, Patna, Bihar - 801503, India
  • Share us via
  • Call 08068051366 Ext. 378
Manufacturer of Cabinets & Enclosures from Patna, Bihar by Aqua Pools & Spa Co.
Post Buy Requirement
AP
Patna, Bihar, India
Verified Add Review

Our Product / Services

  1. Cabinets & Enclosures 4 Products available
  2. Filters 13 Products available
  3. Industrial & Engineering Products 3 Products available
  4. Valves & Valve Fittings 6 Products available
  5. Foot Light 3 Products available
  6. Fountains & Fountain Accessories 9 Products available
  7. Laboratory Apparatus 4 Products available
  8. Others 64 Products / Services available

Cabinets & Enclosures #3016530

Membrane Housing (4.0"E)

Membrane Housing (4.0"E) that we export and supply is designed for continuous and long term use as housings for membrane filtration. Our Membrane Housing is used to treat tap, brackish & sea waters. Our Membrane Housing can accommodate any standard 4 Inch nominal diameter & 40 Inch long spiral wound membrane with ease. In case of female membranes only, membrane interface adapters will be required, which will be supplied along with the housing.

 

User's Guide : Guidelines & Information incorporated in this User’s Guide are intended only as a supplement to good industrial practices. The guide should be used in combination with Engineering Drawing of respective membrane housing model used.

Material Receipt : On receipt, ensure that all the material is received as per ordered qty & in good condition. For any shortages in receipt, intimate the supplier within the stipulated time to void the warranty & in case of transit damages, intimate the concerned insurance agency.

Handling : Membrane housing shell is made of fiber glass & any impact, scratches or mishandling during unloading / loading will reduce the life or make the membrane housing unfit for usage. Ensure that membrane housing packing is intact till the installation.

Installation : Ensure that the installation engineer reads the user guide in detail, before installation. In case of any difficulty, contact the nearest Aquanomics representative.Good industry practices & plumbing / piping codes have to be followed during installation, operation & maintenance in order to assure safe, optimum & long service life of membrane housing. Improper installation can result to catastrophic failure & may result in severe bodily harm or property damage.

Quick Checks : Polyurethane or rubber saddles should be used as an interface between the membrane housing shell & skids / frame.Under pressure, membrane housing must be free to expand. Ensure that flexible fittings & couplings are used to allow expansion. Vessel must not be subjected to excessive stress caused by bending moments. Vessel ports & components should not be used to support piping manifolds or any other components.

Aquanomics 4 Inch Membrane Housing – User’s Guide : Water Leaks Any water leaks from vessel / piping during installation / commissioning should be arrested immediately in order to keep the end plugs & retaining rings clean, dry & free from corrosion. Failure to do so can lead to catastrophic failure & may result in severe bodily harm or property damage.

Special Requirement : Aquanomics provides engineering assistance in selecting appropriate membrane housing & specialty steel for specific applications. Get in touch with your nearest Aquanomics representative. However, the final determination including the evaluation of the construction materials for use in specific environment will be the responsibility of the purchaser.


Precautions : For safer & better service life of membrane housing, follow all the precautionary instructions given below. Failure to do so will void the warranty.

 

Mounting :- Mount the membrane housing centered on horizontal members spaced at recommended span (s) using compliant mounting hardware furnished.

 

Tighten the straps – Maximum one ft-lb.

 

Piping :- Use flexible piping / victaulic couplings for permeate & feed / concentrate connections. Hanging piping manifolds or supporting other components with the membrane housing may result in damaging of membrane housing. Permeate port is made of Engineering Plastic & Tightening the permeate port more than one turn past hand tight will damage the port.

 

Overpressure Protection :- Provide overpressure protection for membrane housing set at not more than 105% design operating pressure.

 

Inspection :- Inspect end closures regularly, replace deteriorated components and correct causes of deterioration.

 

Servicing :- Relieve system pressure before working on the membrane housing. Working on system under pressure may result in severe bodily harm or property damage.

 

Before Start – Up :- Ensure that the retaining ring is in place and fully seated in the groove.

 

Pressures :-

  • Operating the vessel in excess of the ratings, will shorten the life & may result in severe bodily harm or property damage.
  • Engineering permeate port are designed to operate at 125psi, operating at pressure in excess of 125psi must be approved by factory.

 

Aquanomics 4 Inch Membrane Housing – User’s GuideMembrane Housings are not designed for Vacuum conditions; operate only in positive pressure applications.

 

pH Operation :- Membrane Housings are designed for continuous operation at a pH of 3 – 11 & for intermittent cleaning pH 2 –12 for less than 30 minutes.

 

Stoppage :- Some feed waters may cause corrosion under static condition, in order to prevent the system from corrosion, it is recommended to flush the system with permeate water.

 

Engineering : Ensure that the operator / Engineer who carries out the servicing / maintenance schedule has good knowledge of plumbing, hydraulics, membranes, water treatment & good industry practices.

 

Removing the End Plug :

  • Relieve the membrane housing of system pressure.
  • Disconnect the feed / concentrate
  • & permeate piping. Mark i
  • dentification on the piping
  • assembly for easy re-assembly.
  • Remove all contaminants & foreign matter from end margin of the membrane housing, using a scotch-brite, sand paper or brush. Any contaminants interfering with the end plug removal will damage the end plug or I.D of membrane housing.
  • Remove the retaining ring out of the shell / insert ring groove. Continue removing the ring by running your finger behind the ring & carefully pulling the ring from the groove.Take care not to get the finger injured. In case if it is difficult to remove the retaining ring due to prolong use, in such case lightly tap the end plug using a plastic mallet or use any releasing spray for quick & easy removal.
  • Connect threaded Engineering Plastic nipple to the permeate port and gently rock the end plug up & down to release the end plug from the shell. Repeat the above steps to remove the end plug from opposite side.
  • If the end plug is with adapter design, remove the adapter by slowly pulling on the adapter body.

 

Aquanomics  4 Inch Membrane Housing – User’s Guide Closing the End Plug :

  • Check the bore of the membrane housing for any foreign matter or imperfections. Remove all the foreign matter using mild soap solution and rinse with clean water. For imperfections, using a 600 grit sand paper lightly sand the surface & clean with soap water & rinse with clean water.
  • Lubricate all the seals (pwt/ adapter / head) using silicone based lubricant or commercially available glycerin. Apply a very thin layer of lubricant on the seal area of the membrane housing I.D for ease in closing the end plug.Note : Check with your membrane supplier before using the lubricants as they can foul the membranes.
  • If the end plug is with adapter design, insert the adapter in the end plug by slowly pushing in the permeate port tube. Holding the end plug square to the axis of the shell, slowly push the end plug into the shell until the retaining ring groove is clearly visible.
  • Place the end of the retaining ring in the groove of the shell / insert ring & continue pushing the ring counter-clockwise till the ring completely seats into the groove.
  • Reconnect the feed / concentrate & permeate piping.
  • Double check the assembling of end plugs, retaining ring seating in the groove, piping connections etc before pressurizing the system. Take all the necessary safety precautions before start-up.
  • Do not tolerate any leaks. Leaks can lead to corrosion that can lead to component deterioration & eventually catastrophic failure.


Membrane Loading / Un–loading :
Note : Procedure described below is only for information purpose. Membranes should be loaded / un-loaded according to the membrane manufacturer’s instructions. If membranes are not installed properly, malfunctioning of system /membrane damage may occur.

  • As described in End Plug removal section, remove the End Plugs.
  • For unloading the membranes, push the membranes out of the vessel from the upstream end (feed end). Note: Membranes are always removed & installed in the direction of feed flow.
  • While loading the membrane, ensure that the membrane housing bore & membrane outer surface is perfectly clean & contamination free.
  • Lubricate the seals as per manufacturer’s recommendations.
  • Reinstall the end plug on the down stream end as described in End Plug Closing section.
  • Load the membrane with the brine seal (typically a U-cup seal) installed on the up-stream end with it slip facing up-stream.
  • Push the membrane in the housing until the membrane fully engages with the  head on the down stream end.
  • Once membrane is loaded, close the end plug on the up-stream end.

 

Inspection & Overhaul :Once the end plug is removed, dismantle the end plug & separate all the components. Clean all the components with soap water, scotch brite & rinse with clean water. Inspect all the components & shell for any corrosion, dents, cracking, softening, discoloring, imperfection, scratches etc.

 

Plastic (Engineering Thermoplastic) Components :-

  • Cracks & Chip-Off – Replace the components.
  • Softening & Dis-Coloring – Can be due to chemical attack, replace the components, if problem continuous check for alternate material.
  • Damaged Threads – Replace the components.

 

Metal Components :-

  • Dents & Sharp Edges – Using sand paper polish the damaged area, if the problem can be rectified use it or else replace the components.
  • Corrosion – Can be due to non compatibility of water & metal composition or due to chemical attack. Replace the components & if the corrosion continuous check with factory for alternate material.

 

Shell :- Check the bore of the membrane housing for any foreign matter or imperfections.Remove all the foreign matter using mild soap solution and rinse with clean water. For imperfections, using a 600 grit sand paper lightly sand the surface & clean with soap water & rinse with clean water.

Note :-

  • If any component cannot be restored to working /as new condition, replace the parts.
  • Use of damaged components can lead to catastrophic failure.
  • Every time the vessel is serviced, replace used seals with new ones.
View Complete Details

Membrane Housing (8.0"E)

The company is the noteworthy Exporter and Supplier of durable Membrane Housing (8.0"E) procured from the reliable sources. Our Membrane Housing is accredited for its sturdy construction, smooth operation, easy installation and longer service life. We make available bulk quantities of Membrane Housing at very affordable rates. In addition, with the help of our fast transit facilities we are able to deliver the orders within the promised time frame.

Our Range :

  • A8E300 Sales Drwg (8 Inch EE 300 psi) 8.0"E Membrane Housing
  • A8E450 Sales Drwg (8 Inch EE 450 psi) 8.0"E Membrane Housing
  • A8E600 Sales Drwg (8 Inch EE 600 psi) 8.0"E Membrane Housing
  • A8E1000 Sales Drwg (8 Inch EE 1000 psi) 8.0"E Membrane Housing
  • A8E1200 Sales Drwg (8 Inch EE 1200 psi) 8.0"E Membrane Housing
View Complete Details

Membrane Housing (8.0"S)

Membrane Housing (8.0"S) that we export and supply is extensively in demand amongst buyers. We procure Membrane Housing from the most reliable manufacturers and vendors present in the market. Moreover, our Membrane Housing is stringently checked on all quality parameters to ensure delivery of only defect-free range at buyer’s end. Obtain from us, bulk quantities of Membrane Housing at market leading rates.

Our Range :

  • A8S300 Sales Drwg (8 Inch SE 300 psi) 8.0" S Membrane Housing
  • A8S450 Sales Drwg (8 Inch SE 450 psi) 8.0" S Membrane Housing
  • A8S600 Sales Drwg (8 Inch SE 600 psi) 8.0" S Membrane Housing
View Complete Details

Membrane Housing (2.5"E)

Ours is the name involved in the exporting and supplying of efficient Membrane Housing (2.5"E) procured from the reliable manufacturers and vendors. Membrane Housing that we offer is especially designed for providing continuous and long term functionality as housing for membrane filtration. It is used for treating tap & low brackish waters. Our Membrane Housing can accommodate any standard 4 Inch nominal diameter & 40 Inch long spiral wound membrane with ¾” dia male product water tube with ease.

Specifications :

  • Design Operating Pressure : 250 PSI (17.2 Bar)
  • Max Operating Temperature : 49oC (120o F)
  • Min Operating Temperature : -07oC (20oF)
  • Hydro - Test Pressure : 375 PSI (25.8 Bar)
  • Qualification Burst Pressure : 1500 PSI (103.4 Bar)

Download


Download Detail File : Click Here
View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us

  • Mr. Shashi Bhushan (Aqua Pools & Spa Co.)
  • Flat No. 602, Sudama Janki Lalan Apartment, Ranjan Path, Abhiyanta Nagar, Bailey Road, Patna, Bihar - 801503, India
  • Share us via
  • Call 08068051366 Ext. 378