- First process is to design or to formulate the Architects drawing into working drawing from structural point of view.
- For Olympic and semi-Olympic pools all provisions for international law and guide lines are incorporated.
- The safety and associated utilities building are considered as required such as balancing tanks, filter rooms, overflow channel etc.
| Mechanical Work : | - In overflow channel method we uses the piping during civil work with co-ordination of overflow channel, balancing tank and filter room.
- If we are going for Pipeless filters, multifunctional filters or wall hung filter that remove the need of piping at all.(in those cases any agency can perform the civil work).
- The filters are designed as per the requirement, all valves and valve chambers are provided.
- The filtration plant with filter, pump , chemical doser etc. are place and fixed.
- After concreting work and water proofing the most important work is to select the tiles and stone for outer finishing as these are the main finishes of swimming pool.
- The tiles are of three types: Glass mosaic 20x20mm size, Hand made tiles usually 50 x50 mm and ceramic tiles. Some time the stone is also the finishing of swimming pool.
- On deck area the planters and foot decking is provided. The stone, granite or tiles can be the finish wood is also great idea, but wood timely maintenance.
| |