| TESTING, MAINTENANCE & PROTECTION OF DISTRIBUTION TRANSFORMERS WHAT IS A TRANSFORMER?TRANSFORMER IS A STATIC DEVICE WHICH TRANSFORMS A.C. ELECTRICAL POWER FROM ONE VOLTAGE TO ANOTHER VOLTAGE KEEPING THE FREQUENCY SAME BY ELECTROMAGNETIC INDUCTION. TYPES OF TRANSFORMER BY APPLICATION 1. DISTRIBUTION TRANSFORMER2.POWER TRANSFORMER3.CURRENT TRANSFORMER4.POTENTIAL TRANSFORMER5.FURNACE TRANSFORMER6.BOOSTER TRANSFORMER7.RECTIFIER TRANSFORMER8.LOCOMOTIVE TRANSFORMER9.MINING TRANSFORMER10.PHASE SHIFTING TRANSFORMER11.WELDING TRANSFORMER12.HIGH VOLTAGE TESTING/SC TESTING TRF.13.GROUNDING TRANSFORMERS14.CONVERTER TRANSFORMER DISTRIBUTION TRANSFORMERTRANSFORMER WHICH IS USED FOR THE PURPOSE OF DISTRIBUTION OF POWER.11KV/433V is the standard voltage rating.STANDARD KVA ratings are25, 63, 100, 160, 200, 250, 315, 400, 500, 630, 750 , 1000 , 1250, 1500, 2000, 2500 KVA.IS-2026 is the NATIONAL I S STANDARD. MAIN FEATURESOUTDOOR, OIL COOLED, 3 PHASE, 50HZPRIMARY IS DELTA CONNECTED AND SECONDARY IS STAR CONNECTED.NATURALY COOLED (ONAN TYPE).AMONGST ALL THE TYPES OF TRANSFORMERS THIS IS THE MOST REQUIRED AND MOST USED TYPE.PARTS OF TRANSFORMERMAIN TANKRADIATORSCONSERVATOREXPLOSION VENTLIFTING LUGSAIR RELEASE PLUGOIL LEVEL INDICATORTAP CHANGERWHEELSHV/LV BUSHINGSFILTER VALVESOIL FILLING PLUGDRAIN PLUGCABLE BOXTESTING OF TRANSFORMERTESTING IS CARRIED OUT AS PER IS-2026.ROUTINE , TYPE TESTS & SPECIAL TESTS ROUTINE TESTS ( TO BE CARRIED OUT ON EACH JOB) 1.Measurement of winding resistance2.Measurement of insulation resistance3.Seperate source voltage withstand test (High Voltage tests on HV & LV)4.Induced Over voltage Withstand test (DVDF test)5.Measurement of voltage ratio6.Measurement of NO LOAD LOSS & current.7.Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)8.Vector Group Verification9.Oil BDV test.10.Tests on OLTC (if Attached) TYPE TESTS THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT.All routine testsAdditionally following tests are included in type testsLightening Impulse test.Temperature rise test SPECIAL TESTSAdditional Impulse testShort circuit testMeasurement of zero Phase sequence Impedance test.Measurement of acoustic noise level.Measurement of harmonics of the no load current.Magnetic balance test. ROUTINE TESTS Measurement of winding resistance This test measures the resistance of the HV & LV winding. The values of resistance should be balance for all three phases and should match the designed values.Equipment used : Digital resistance meter. ROUTINE TESTS Measurement of insulation resistance Measures the insulation resistance of HV & LV windings with respect to earth (body) and between LV & HV winding.INSULATION TESTER OR MEGGER IS USED. Recommended Values are2000Mohms for HV & 500 Mohms for LV. ROUTINE TESTS Seperate source voltage withstand test (High Voltage tests on HV & LV)- This test checks the insulation property between Primary to earth, Secondary to earth and between Primary & Secondary. HV high voltage test : LV winding connected together and earthed. HV winding connected together and given 28 KV ( for 11KV transformer) for 1 minute.LV high Voltage test : HV winding connected together and earthed. LV winding connected together and given 3 KV for 1 minute.Equipment used : High Voltage tester ( 100KV & 3KV) ROUTINE TESTSInduced Over voltage Withstand test (DVDF test)- This test checks the inter turn insulation. For a 11KV/433V transformer, 866 Volts are applied at the 433V winding with the help of a Generator for 1 minute. This induces 22KV on 11KV side. The frequency of the 866V supply is also increased to 100HZ. Equipment used : MOTOR GENERATOR SET ROUTINE TESTS Measurement of voltage ratio This test measures the voltage ratio as per the customers requirement.V1/V2 = N1/N2The voltage ratio is equal to the turns ratio in a transformer. Using this principle, the turns ratio is measured with the help of a turns ratio meter. If it is correct , then the voltage ratio is assumed to be correct.Equipment used : Turns Ratiometer ROUTINE TESTSMeasurement of NO LOAD LOSS & current. The iron losses and no load current are measured in this test. The 433V winding is charged at 433V supply & the 11KV winding is left open .The power consumed by the transformer at no load is the no load loss in the transformer. Effect of actual frequency must be taken into account.Equipment used : Wattmeters or power analyser. ROUTINE TESTSMeasurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY & REGULATION)This test measures the power consumed by the transformer when the 433V winding is short circuited and The rated current is passed through the 11KV winding.Equipment used : Wattmeters or power analyser. ROUTINE TESTSVector Group Verification test This test verifies the Dyn-11 vector group of a distribution transformer. Equipment used : voltmeter. ROUTINE TESTSOil BDV TEST.Oil breakdown voltage is checked as per IS-335.100 mm L X 70 mm B X 80 mm Ht. glass pot.500ml Oil sample.Spherical electrodes with gap of 2.5 mmRecommended value : 60KV Equipment used : OIL BDV TEST SET. TYPE TESTS LIGHTENING IMPULSE TEST All the dielectric tests check the insulation level of the job.Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds waveOne impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three impulses at full voltage.For a three phase transformer, impulse is carried out on all three phases in succession.The voltage is applied on each of the line terminal in succession, keeping the other terminals earthed.The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the wave shape is the criteria for failure. SPECIAL TEST Short circuit withstand ability test. This tests measures the ability of the transformer to withstand the mechanical and thermal stresses caused by the external short circuit.HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The testing plant parameters are such adjusted to give the rated short circuit current.Supply is made on and closed after specified duration of short circuit. The record of current wave form is noted.There should not be any mechanical distortion, fire to the transformer during this test. Similarly no wave form distortion. The transformer should also withstand the routine tests after the short circuit test.The reactance of the winding measured before and after the S.C. test should not vary beyond the limits stated in the IS2026. MAINTENANCE OF TRANSFORMER Transformer is the heart of any power system. Hence preventive maintenance is always cost effective and time saving. Any failure to the transformer can extremely affect the whole functioning of the organization. |