Our Products
Our product range contains a wide range of Cut Wire Shot 1.5mm, Stainless Steel Shot, Aluminium Cut Wire Shot, Steel Shot and Steel Cut Wire Shot
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : 25kg/Bag, 40bags in a 1000kgs-Bag or on a Pallet
Delivery Time : All of our goods are in stock, they can be shipped within 3-7 days after confirming the order
Additional Information:
Payment Terms : L/C, T/T, Western Union
Packaging Details : 1.25kg per bag, 40 bags per plywood pallet
2.25kg per bag, 40 bags per carton
3.1000kg per jumbo bag
Delivery Time : All of our goods are in stock, they can be shipped within 3-7 days after confirming the order
Additional Information:
Payment Terms : L/C, T/T, Western Union
Packaging Details : 1.25kg per bag, 40 bags per plywood pallet
2.25kg per bag, 40 bags per carton
3.1000kg per jumbo bag
Delivery Time : All of our goods are in stock, they can be shipped within 3-7 days after confirming the order
Additional Information:
Payment Terms : L/C, T/T, Western Union
Packaging Details : 25kg per bag , 40 bags in one pallet
Delivery Time : 7 days after receiving the down payment
specifications 1, competitive price 2, low consumption 3, largest manufacturer of metal abrasive in china 4, iso9001 5, good after-sale service size of steel cut wire shot :cw0.8mm, cw1.0mm, cw1.2mm, cw1.5mm, cw2.0mm, cw2.5mm. Steel cut wire shot operative standards: we strictly abide by standard of sae j441, jbt 8354-1996steel cut wire standardof machinery industry of republic of china to choose material and manufacture. But the length and specification have little difference due to recycled steel wire.
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : 1.25kg per bag, 40 bags per plywood pallet
2.25kg per bag, 40 bags per carton
3.1000kg per jumbo bag
Delivery Time : within 3-7 days after confirming the order
Additional Information:
Payment Terms : L/C, T/T
Packaging Details : 25kg/Bag, 40bags/Pallet or According to your Requirements
Delivery Time : 3-5 Days After The Advance Payment