We are offering reducing tee. Product forged steel equal tee size range 12"-24" are made by seamless pipes, above up to 72" are made by welded pipesthickness sch20 sch40 std sch60 schxs sch80 sch160 schxxs etc are availablestandards astma234, astm a420, ansi b16.9b16.28b16.25, asme b16.9, jis b2311-19972312, jis b2311b2312, din 2605-126172615, gb 1245999, en standard etc.Materials stainless steel, carbon steel, alloy steelstainless steel(astm a403 wp304, 304l, 316, 316l, 321. 1cr18ni9ti, 00cr19ni10, 00cr17ni14mo2, ect) carbon steel(astm a234wpb, , a234wpc, a420wpl6. 20#, q235, 10#, 20#, a3, q235a, 20g, 16mn, ect) alloy steel(astm a234 wp12, wp11, wp22, wp5, wp9, wp91, 16mnr, cr5mo, 12cr1mov, 10crmo910, 15crmo, 12cr2mo1, ect) connection but welding, socket welding, threadedsurface stainless steel: polishing, sand-blastingcarbon steelalloy steel:blackpainting, varnishpaint, antirustoil, hotgalvanized, coldgalvanized, 3pe, etcapplication petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etcpackage plasticfilm, woodencases, woodenpallet, oraccording tocustomers'requestcertificate api, and iso9001:2000 certificates, ce, bv, etc.Capacity 50000tonsyearadvantages 1.reasonable price with excellent quality2.abundant stock and prompt delivery3.rich supply and export experience, sincere service4. Reliable forwarderport of loading xingang (tianjin) portpayment terms 30% down payment, the balance 70% tt before the shipment or lc at sight.Delivery time 7-30 days, according to the order quantity.
Additional Information:
Payment Terms :
L/C, T/T
Delivery Time : 30 days