-
Min. Order (MOQ)
1 Set(s)
-
Brand Name
XIANGJIE
we are offering 1000 ton hydraulic rubber press, rubber molding vulcanizer pressing machine. 1000t hydraulic rubber press, molding vulcanizer pressing machine 1.brief introduction xiangjie rubber machinery make hydraulic rubber press / molding vulcanizer pressing machine in column , frame , slab-side design . this type of hydraulic rubber press / molding vulcanizer pressing machine has become well known for its reliability , high productivity and its excellent accessibility for loading and unloading the daylights . all presses are supplied with complete hydraulic pumping unit in compact design including electrical controller box . the daylights can equiped with moulds having different widths and profiles. 2. feature: automatic ascending, bumping, pressurization and descending operations. high speed ascending, pressure retaining for better product quality. fast release valve for fast descending but incorporates adjustable speed. depressurization can be adjusted to suit thickness of products. special designed platens for even heating area. the above features can be incorporated in automatic and semi-automatic machines. major construction details: press frame : made out of steel q-235 capacity : from 100 ton - 5000 ton cylinder : cylinders made out of solid steel forging material. pressure ring : gunmetal ring oil seal : chevron packing oil seal mould :made out of m.s. prime plate tested material, accurately machined finished and hard chrome plated. moulds are hydraulically pressure tested to ensure no leakage. heating methods : steam , thermic fluid operation : manual , automatic , plc 3 technical specifications: total pressure: 1000ton adjusted plate size: 1500x1500x60mm daylight opening: 600mm mould closing and opening speed: 40mm/s pressing speed: 4mm/s hydraulic cylinder: single action hydraulic cylinder equipped with safe light curtain system, emergency stopping switch. overall size: 2200x1524x4500mm weight: 50000kg
Additional Information:
Payment Terms :
L/C, T/T
Packaging Details : channel steel fixed at the bottom and covered with plastic sheet
Delivery Time : in 75 workign days