We are offering cone crusher. commissioning: the energy-saving ball mill installation is complete, have passed the test, you can empty commissioning. The ball mill commissioning should be skilled mill operators responsible for, and strictly comply with the mill safe operation. (a) air operation, continuous operation time of at least 12-24 hours of operation, the problem should be addressed. (b) air test machine and the normal to the load test run. Load test run should be ball millimplemented in phases. Load operation should be considered nesting feeding, to avoid unnecessary balls and cylinder liner wear loss and damage. 1, by adding the appropriate material and 1/3 the number of steel balls (maximum amount of ball see the ball mill to the main librtrituradora de mandbulaary) for commissioning 12-24 hours. 2, added to the 2/3 the numbejaw crusherr of ball running 24-48 hours. 3, according to the ball mill discharge situation, the production of qualified products, in the light of similar concentrator mill the actual amount of ball to determine the reasonable amount of ball the ball mill, carried out step less than 72 hours of commissioning. (c) the increase of the load and commissioning of the length of time, the running of the size of the gear reducer gear (temperastone crushersture, noise, tooth contact, etc.) as a basis for determine. The accuracy of tooth contact did not meet the design requiball millrements, shall not operate at full capacity. (d) the commissioning of cooling and lubrication systems should be working properly. The main bearings, transmission bearings, reducer temperature should be normal. (5) into the 2/3 the number of ball commissioning 24-48 hours should be checked and re-tighten all bolts. (f) commiceramic sand kilnssioning work to do a good job of the record.