Our Product / Services
We are manufacturer and have supplied over 350 machines all over the country.
Additional Information:
Payment Terms : T/T
Packaging Details : Wooden and card board packets
Delivery Time : 4 weeks
CNC gas cutting machine heavy duty deive rack on both the long and the cross travel direction, ensure high accuracy and long service life.Carefully machined heavy duty rails give accuracy and stability to the machine for the whole working life.
Additional Information:
Payment Terms : T/T
Complete solutions to automize the welding process like MIGTIGSub Arc is available as per the product and required production rate. PLC Controlled panels to provide the flexibility in automations. Maximum safety gadgets are installed to avoid accidents causing damages to production components, equipments, and or Operator. System to evaluate cost of the weld, time, and recording of parameters are available. We try to provide modular designs in SPM wherever possible. Standard Components are used at max places so as to reduce the cost of inventory. Infrastructure available for all Service Operation related need.
Additional Information:
Payment Terms : T/T
Packaging Details : Wooden Packing / Card Board Packing and Plastic wrapping
Delivery Time : 8 weeks to 10 Weeks