My ExportersIndia

For Buyer

For Seller

For Help

Our Products

We offer a complete product range of Automatic Harmonic Filter Panels and Contactor Switched Automatic Harmonic Filter Panels

Automatic Harmonic Filter Panels

  • \r\n System Voltage\r\n \r\n 400.1000 V\r\n
  • \r\n Filter tuned to\r\n \r\n 3rd, 5th, 7th, 11th, 13th\r\n
  • \r\n Rated KVAR\r\n \r\n 50.6000 KVAR\r\n
  • \r\n Type\r\n \r\n Auto\r\n
  • Standards IEC 61921 for capacitor bank

Fast Acting Thyristor Switched Automatic Harmonic Filter Panel (RTPFC Panel) is real time passive tuned filter systems using Clariant make Thyristor switched modules. Capacitor Switching at precise Zero current crossover threshold, means : "NO" inrush current at switching "No Instant", No generation of voltage or current spiker. surges and harmonics. Instant correction of load power factor. The response time could be as small as 20 mili seconds. Better control over MD KVAr compensation help in achieving substantial saving in Electricity Bills by reducing KVAh and rKVAh consumption.

Features :

  • Excellent performance
  • Thyristor switching is highly reliable with minimum maintenance
  • The capacitors are switched at "zero current cross over threshold


Applications :

  • Suitable for fast variable loads, where contactor controlling systems fail to give desired results
View Complete Details

Contactor Switched Automatic Harmonic Filter Panels

  • \r\n System Voltage\r\n \r\n 400.1000 V\r\n
  • \r\n Design Voltage\r\n \r\n 525.1750 V\r\n
  • \r\n Filter tuned to\r\n \r\n 3rd, 5th, 7th, 11th, 13th\r\n
  • \r\n Rated KVAR\r\n \r\n 50.6000 KVAR\r\n
  • \r\n Type\r\n \r\n Auto\r\n
  • Standards IEC 61921 for capacitor bank

Contactor switched Automatic Harmonic Filter Panel ( AHPFC Panel ) is passive tuned filter systems using Frako, Germany make contactors & make thyristor switched module.
Automatically controlled power factor regulation, low installation cost. Harmonic filters are in detuned mode (133Hz, 189Hz) and effectively reduce at 5th, 7thharmonics inturn l2R and eddy current losses in the systems. We can achieve any target power factor with this scheme. Results in potential savings in electrical bill with the convincing payback period 12 months.

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us