-
Moisture Content
5.89 %
-
Fe
63.01 %
-
Sio2(Silica)
4.79 %
-
A1203(Aluminium)
2.06 %
-
TiO2(Titanium)
0.17%
-
Sulphur
0.02 %
-
Phosporous
0.003 %
We are offering iron ore. Miner :pt.prima tilo bara location iup op :jorong lolo kenagarian suriyan-solok-indonesiadistance stockpile to port : 2 km barge capacity : 8000 mt 12000 mt anchorage m. Vessel : 30.000 mt loading rate mv/day : 5000 mt/day loading mv for 30.000 mt : 6 days contract duration : according the purchasing contract inspection surveyor : ccic or intertex document : certificate quality and quantity validity : 5 days delivery schedule : 30-45 days size : 0-10 mm terms of payment : lc at sight
Additional Information: