Required space for Design/Making parking as per site condition/application feasibilty.
Each Panels move linearly into Aluminium top track Channel (75X75) ofAluminium Finish, hung with help ofnylon roller fixed with top rail/Profile of SS-304 material and Aluminium Finish.
Each Panels are disintegrated to each-other parked into the designed parking aside.
Top track of Aluminium (75X75) and Designed Parking , hung to MS structure or solid concrete (NOT IN OZONE SCOPE).
Bottom rail would be lock into the floor with dust excluding socket of SS-304.