Our Product / Services
we are a manufacturer of cooling tower internals and external fabrication parts.
like structure, grating, ladder, foot support, hub, block, hardware, access hatch, trolley, etc
.Additional Information:
Payment Terms : L/C, D/P, T/T
Delivery Time : 30-50 Days
Features :
Additional Information:
Payment Terms : L/C, D/A, D/P, T/T, Western Union
Delivery Time : 30-50 Days
We offer PVC drift eliminator and S type Drift Eliminator for cross and counterflow cooling towers.
Drift Eliminators, made out of rigid PVC, are designed to remove entrained particles from air steam efficiently, with minimum pressure drop, thereby reducing the fan power requirement when the air passes through the Drift Eliminator. Water droplets are separated from the air drift at the three direction change points on the drift eliminator.
Drift eliminator removes the water droplets out of the drift eliminator area and return them back into the tower and does not allow any re-entry. The spacer arrangement for quick and simple assembly at site
Additional Information:
Payment Terms : L/C, D/A, D/P, T/T
Delivery Time : 30-50 Days
We offer cooling tower drive shaft. Cooling tower drive shaft : ss-304, ss-316 and ms with coupling, rubber bush and dynamic balanced as per iso1940 g 6.3 grade.
MS, SS- 304
Up to 4.5 meters
Additional Information:
Payment Terms : L/C, Western Union, ,
Progetto Cooling Technologies Pvt. Ltd. is a Thane (Maharashtra) based company that specializes in offering matchless cooling tower designing services. We are operational in this business for years and have delighted a number of clients with our premium services for cooling tower designing. Our skilled manpower makes sure to firmly fix the screen on windows so that the insects cannot infiltrate the interior to annoy further. Right from counter flow & cross flow design program to single cell and multi cell design, we provide effective solutions all kinds of cooling tower designing needs.
Additional Information:
Payment Terms : L/C, D/P, T/T
Delivery Time : 30-50 Days
When it comes to cooling tower installation in Thane (Maharashtra) or anywhere in India, then a number of clients prefer to get it done by Progetto Cooling Technologies Pvt. Ltd. We have immense exposure in rendering cooling tower installation services across the Indian subcontinent, and our service is inclusive of erections of cooling tower of any size, capacity, and type at client locations. Right from periodic erection to dismantling activities to erection of mechanical equipment / parts etc., we handle everything carefully to ensure maximum satisfaction of the patrons. We also specialize in preparation and processing of technical drafts, water flow testing by using Pitot tube or ultrasonic flow meter, and air flow testing.
progetto cooling technologies pvt. Ltd. Is one of the reputed companies operating from thane (maharashtra) that offer impressive cooling tower maintenance service. Backed with vast domain expertise and experience, we are capable of providing effective solutions for the maintenance of cooling tower internals, upgrade of equipments parts and instruments, conducting emergency repairs, taking up overhaul and revamps, conducting periodic inspections, ensuring noise reduction, modernizing the existing cooling towers, and what not. Right from painting and protection to amc of cooling tower to corrosion preventions, we look after everything with perfection, and provide effective solutions at a low cost.
Additional Information:
Payment Terms : L/C, D/A, D/P, T/T, Western Union
Delivery Time : 30-50 Days
Additional Information:
Payment Terms : L/C, T/T
Features :
Additional Information:
Payment Terms : D/P, T/T, Western Union
Additional Information:
Payment Terms : L/C, D/A, T/T
Delivery Time : 30-50 Days
We offer different types of nozzle assemblies for cooling towers. The performance of the cooling tower greatly depends upon the water distribution over the fills. The nozzles distribute water evenly through a wide spray angle without any dry pockets. They are lightweight and reduce the frequency of clogging.
Additional Information:
Payment Terms : L/C, D/P, T/T
Delivery Time : 30-50 Days