Compliance with prescribed harmonic limits No penalty, Unity Power Factor higher savings, Reduced energy (kVAh) charges higher savings, Reduced peak demand charges higher savings, Reduced fuel consumption in generators higher savings, Ultra fast compensation effective with fast fluctuating load, Optimum capacity utilization of electrical infrastructure, Optimum capacity utilization of backup generators.