-
Min. Order (MOQ)
1 Set(s)
-
Brand Name
Yuanyao
-
Place of origin
Guangdong, China
-
Inspection
In house
-
Warranty
Free parts warranty for 12 months
-
Certificate
CE, TUV, SGS
-
Customization
Available
We are offering high temperature aging oven. Introduction of high temperature aging oven this oven adopts computerized electronic digital control, precise & reliable.the packing of box insulation is moulded by silicone, hihg-temperature enduring & never aged attache with observation view window, easy to be used.heating is by compusory circulation ventilation, temperature raising is fast and spread even.pid control system, double sided overheating protection, safe & reliable. Easy to set temperature, easy to operate.attache dtwo sets of movable disd to be adjusted high and low at your disposal. Main features of high temperature aging oven: 1. Adopt precise and reliable control way of computerized electronic digital controller. 2. The door sealing uses silicone, which endures high temperation. View window attached. 3. The centrigugal fan provides greater cyclic airflow to avoid dead corner in the chamber so as to obtain uniform distribution of temperature. technical specifications of high temperature aging oven: model no:ypo-600 inner size:10001000600 exterior size:12001700840 room temp.+10c+200c(300c) ferformance temp.&humi, constancy 0.3c temp.&humi, constancy 0.1c at 200c 1.5%at300c indication resolution 0.1c1c heat-up time( min.) approx.60min. Material exterior iron sheet+baked enamel interior sus#304 stainless steel piate insulation fiberglass wool systems cirulation circle fen heating chrome steel strip wire heater controller electric digital control+s.s.r. Single-wing double-wing environmental control indicator lights, experiment separation shelves(2 pcs). Overheating prevention circuit breaker, control system, breakdown indicator light. Power supply:ac 1 220v 3 380v 6050hz
Additional Information:
Payment Terms :
L/C, T/T,
Packaging Details : Well packed in strong wooden case for long distance shipment.
Delivery Time : About 20 working days after receipt of down payment