My ExportersIndia

For Buyer

For Seller

For Help

XH2QHot Detarring Gas Station

Our coal gasifier is characterized by high capacity, complete gasification and better coal adaptability, high gas calorific value, easy operation and strong safety performance. It is widely used in many industries. The technological flow: Up-stage gas gets into electrostatic precipitator, which work temperature is between 90~150°C, where the More..

Hot Deterring Gas Station Of Two Stage Gasifier

  • Min. Order (MOQ) 1 Set(s)
  • Certification ISO 9001
  • Usage Generating coal gas
  • Specifications 1.High efficiency 2.High gasification efficiency 3.High heating value 4.Higher autoimmunization
  • Brand Name Xianghe
We are offering hot deterring gas station of two stage gasifier.coal gasifier, also called gas generator, is energy-saving and environmental protection equipment with air and steam mixture as gasifying agent and coal as fuel. In the gasifier hearth, coal and gasifying agent have oxidation-reduction reaction at high temperature and coal gas mainly consists of co and h2 is produced. It is widely used in many fields such as metallurgy, ceramic, glass -making, non-ferrous metal, chemical industry, refractory material, machinery, etc. Our coal gasifier is characterized by high capacity, complete gasification and better coal adaptability, high gas calorific value, easy operation and strong safety performance. It is widely used in many industries. The technological flow: up-stage gas gets into electrostatic precipitator, which work temperature is between 90150c, where the tar fog-drops and dusts are polarized and then influxed on inside wall of polar tube, and finally flows automatically to tar pool. Firstly, down-stage gas gets into the cyclone dust remover and remover and centrifugally separated. The temperature is lowered to about 450550c. Up-stage gas is mixed with down-stage gas and then sent to user.

Additional Information:

Payment Terms : L/C, T/T

Packaging Details : Export standard container 20GP or 40 GP 40HQ FR container in bulk.The spare parts will be packaged in wooden case

Delivery Time : 30~45 days after the contract confirmed

View Complete Details
Tell Us What are you looking for? Will call you back

Contact Us