Daftech Engineers Private Limited - Effluent Treatment Plant
Our Complete range of products are DAF Clarifier Slaughterhouse Effluent Treatment Plant and DAF Clarifier Effluent Treatment Plant.
DAF Clarifier Slaughterhouse Effluent Treatment Plant
- Min. Order (MOQ)1 Piece piece
- Number Of FlowerCircular
- Material of ConstructionPU-coated MS, SS 304, SS316, SS316L, Duplex Steel
- Capacity3 units per month
- Inlet TSS (Mg/L)Up to 2000 ppm
- Treatment Capacity (m3/h)5 m3/hr to 1250 me3/hr
- Air flow rate(m3/h)Depeds on feed rate
- Surface Area (m2)1.02 m2 to 197.95 m2
- Applicable IndustrySlaughter House
- Automation GradeSemi-Automatic
- Diameter1219 mm to 16800 mm
- Max. Capacity Excluding Recycle1250 m3/hr.
- Tank diameter ranges1.2 m to 16.8 m.
- Treatment Capacity5m3/hr to 1250m3/hr
- IndustrySlaughter House
- Dimensions (in meters)Diameter 1.2 meter to 16.8 meter
- Volume (in cubic-meters)0.225 m3 to 62.37m3
- Surface Area (in meter-square)1.02 m2 to 197.95 m2
- Hydraulic Loading9.6 m3/m2/hr
- Solids Loading16 kg/m2/hour
- Driving PrincipleCentre Driven
- Bridge TypeFull Bridge, Half Bridge
- Tank Diameter1.2 meter to 16.8 meter
- Installation/Civil WorkInstallation Available
- Approximate Power Consumption (in kW)Depends on Floatcell Size
- Manufacturing Lead Time3 months
- Tank Height650 mm
Additional Information:
Payment Terms : L/C, T/T
Delivery Time :3 months
View Complete DetailsDAF Clarifier Effluent Treatment Plant
- DimensionsDiameter 1.2 to 16.8 meter
- Material of ConstructionSteel
- Automation GradeSemi-Automatic
- Max. Capacity Excluding Recycle1247 m3/hr
- Tank HeightGenerally 1000 mm
- Float Cell SizeDiameter 1.2 to 16.8 meter
- Treatment Capacity500 m3/hr, 1000 m3/hr
- IndustryDairy Industry, Pharmaceutical Industry, Paper Mills, Leather Industry, Chemical/Petroleum Industry,
- Inlet Water QualityGenerally TSS up to 6000 ppm
- Treated Water QualityTSS less than 100 ppm
- Volume (in cubic-meters)0.2 m3 to 62 m3
- Surface Area (in meter-square)1.02 to 197.95 m2
- Driving PrincipleCentre Driven
- Bridge TypeHalf Bridge
- Tank Diameter5 m, 10 m
- Installation/Civil WorkInstallation Available
- Manufacturing Lead Time12 weeks
- Number Of FlowerCircular
Features:
- Low capital and operational costs
- Continuously self-cleaning
- Totally integrated
- Minimal maintenance
- Pre-engineered
- Stable operation
- Space saving and low foundation costs
- High quality clarified water
- Simple installation
- Superior performance
- High chemical efficiency
View Complete Details