Power Failure/Emergency Operation : 1. By Integrated Hydraulic Pump.
2. By Hydraulic Accumulator3 Operation.(up-down-up)
Operation Time : Raising 4-8 sec, Lowering 4-6 Sec
Integration : Capable of integration with the overall architecture of surveillance & overall structure.
Operation Temperature Range : - 5 º C t o + 6 5 º C
Vertical Load : 100 KN Vertically(20T/Axle)
Material of construction : Carbon Steel with Power coated finish or Staniless Steel in grade-4 finish and the housing top cover is made of high impact plastic with customizable size.
NW Heel Load : 100 KN
Surface Protection : Galvanized & Plastic Coated
Hydraulic Fluid : Mineral or Biodegradable Fluid
Electric Controls : Steel or Glass Fiber Reinforced Cabinet
Operation Temperature Range : - 5 º C t o + 6 5 º C
Operation Time : Raising 4-8 sec, Lowering 4-6 Sec
Material of construction : Carbon Steel with Power coated finish or Staniless Steel in grade-4 finish and the housing top cover is made of high impact plastic with customizable size.
Available Integrated Drive Unit : Single Unit CP220-S
Double Unit CP220-D
Tripple Unit CP220-T
Set of 4 CP-220O
Set of 4 CP-220QP
Set of 4 CP-220H
Electric Controls : Steel or Glass Fiber Reinforced Cabinet
Finish : Galvanized & Plastic Coated
Hydraulic Fluid : Mineral or Biodegradable Fluid
Surface Protection : Galvanized & Plastic Coated
Power Failure/Emergency Operation : 1. By Integrated Hydraulic Pump.
2. By Hydraulic Accumulator3 Operation.(up-down-up)