Surface Preparation : Primed surface must be clean, dry, free of moisture and other contaminants.
Environmental Conditions : Surface temperature must be at least 3°C above Dew Point to prevent condensation.
Pot Life : 30 mins. at 30°C
Packaging Size : 10 kg
Application Method : Trowel & Roller
Recoating Time : Min. 16 Hrs at 30°C
Shelf Life : 12 months under normal storage condition in original sealed containers at 30 deg C
Application Instruction : Stir the component A and component B respectively. If settling observed in the component A, loosen the settled material and mix it with the help of pneumatic stirrer.