Features This component enables the early striking of the system allowing the Decking & the Infill Beams along with the plywood to be removed for re-use on upper levels in 3 to 4 days of concrete pour. Before, during and after the early striking the top plate of teh drop Head maimore...
Material of pipe / plate mild steel material of wedge plate malleable cast iron / forged steel type of welding mig welding surface finish red oxide / painted. more...
Drop Head & Its Allied Parts The most important part of shuttering is the drop head made with an extra-strong steel wedge. SIE drop heads allow the beams, infill and panels to be lowered at a hammers stroke. The wedge is specially constructed to endure repeated strokes of the hammore...