Our Products
Our Complete range of products are Salt Fog Test Chamber, Environmental Test Chamber, Water Spray Chamber and Dust Chamber.
The updated models of Salt/Cass Fog Test Chamber specially designed for evaluating the corrosion resistance of the surface treatment of metallic materials by Copper Accelerated Acetic Acid Salt Spray Test Method. It consists of following parts :
The Control Panel will House :
Safety DeviceAudiovisual Alarm start at the time of shortage of water in both the Saturating Tower and Solution Tank.
WiringAll wiring will be as IS code. Channel type wiring will be done with suitable current rated copper wires.
Standard Accessories
Power Supply : 220/240 V, 50 Hz, Single Phase, AC Mains.
Performance
Standards : As per ISO 7253:1984, IS – 101 (Part 6/Sec 1 – June 1997), IS – 9000, IS – 6910, ISO – 3768 Part-I, ASTM – B – 117 – 73, ASTM – B – 368, DIN – 50021, JIS – 2371
Model, Volume, Size And Price
| Model No. | Internal Volume | Internal Size |
|---|---|---|
| KVSCI-66-0.2 M³ | 0.2 Cubic Mtr. (202 litres approx.) |
750 x 600 x 450 mm |
| KVSCI-99-0.4 M³ | 0.4 Cubic Mtr. (405 litres approx.) |
900 x 750 x 600 mm |
| KVSCI-99-0.45 M³ | 0.45 Cubic Mtr. (450 litres approx.) |
900 x 900 x 600 mm |
| KVSCI-99-1.00 M³ | 1.00 Cubic Mtr. (1000 litres approx.) |
1000 x 1000 x 1000 mm |
We are Manufacturing Environmental Test Chamber for customers in India and overseas. We are a recognized Environmental Test Chamber Manufacturer, Exporter and Supplier. Our Environmental Test Chambers are precisely designed by our domain experts as per the set industrial standards and norms.
Environment Chamber
Air CirculationThe homogeneous condition of temperature inside the chamber maintaining by a forced blower with continuous duty rated TEFC motor for circulation. The conditioning space in the main chamber is baffled and heater and cooling coil is located in the conditioning space. The refrigeration unit is fitted under the chamber so as to ensure minimum space utilization.
Heating SystemLow surface loading sealed tubular heaters conforming to IS-4159 provided to add heat in the chamber. The heaters are located in the conditioning space and there will not be any direct radiation of heat on the item under test.
Humidity SystemLow-pressure moisture generator will be provided to generate moisture and add humidity in the chamber. The generator will be of minimum water level controller and mechanical float type refilling arrangement. Soft water will be used for the moisture generator.
Refrigeration SystemTwo-stage air cooled cascade refrigeration system will be provided with evaporative cooling attachment for working in high summer ambient condition. The system is fitted with HP/LP cut off switch, overload protector, backup fuse protection etc. Low RH condition is maintained by smooth tube evaporation coil dehumidification arrangement.
Controller Microprocessor Based Programmable Controller for Temperature and RH with Printing Facility.
Control Panel & Wiring Control Panel will be provided at the lower side of the chamber, which will house Microprocessor Based Programmable Controller for Temperature and RH with Printing Facility, On/Off Switches, Fuses, Contactors, Digital Volt Mater, Digital Ampere Meter, Limit Switch, MCB and Indicating Lamps etc. All the channel type wiring will be as per IS code.
Safety Protection
Utilities
The updated model of Water / Rain Spray Chamber specially designed to determine suitability of electronic and electrical components driving under rain conditions.
Construction
Chamber The chamber will be provided with a cylinder in the centre with 8 nos. of sockets, which will be connected to the nozzle. The cylinder will be fed through a suitable pump to create the sufficient pressure with by-pass valve and the main valves will control the pressure in the cylinder which in-turn control the pressure at the nozzle tips. All the connections will be provided with compression fitting for leakproofness. The same water will be re-circulated.
Precipitation Measurement : Precipitation measurement will be done by using collector of 100 mm height and inside diameter 140 mm.
Water Spray Nozzles As per IS – 9000 : Water Spraying 8 Nozzles capable of spraying water in solid cone form to get precipitation rate of 2.5 mm / minute will be equipped in the chamber. Eight Water Spray Nozzles will be equipped in the Chamber out of which Four Nozzles at the top Four Corners at an angle of 45° and four Nozzles in the centre of each four sides.
Rain & Shower Nozzle As Per JIS D 0203 : Shower through 40 holes and rain through two holes. Rotation of the Rain & Shower Nozzle is 17 rpm.
Pressure Gauges : Separate pressure gauge will be provided for each spray nozzle along with Pressure Regulator, for indicating the pressure of the nozzles at the nozzles. The pressure gauges will be mounted on the panel and equivalent length of copper tubing which run to the nozzle end and the gauges will be calibrated accordingly.
Port Holes : Port Holes with suitable Rubber Plugs will be provided to access for Internal Chamber Volume and for connecting wires/pneumatic pipes etc.
Revolving Table : Revolving Table with geared motor with Clockwise & Anticlockwise rotation having diameter between 450 mm to 500 mm at the centre of the working space will be provided. Table will be capable of rotating around its vertical axis.
Table RPM :The RPM of the table will be variable between 2 to 10 rpm with an accuracy of ±0.5 rpm.
Hour Meter : The Chamber will be equipped with Hour Meter for chamber operation time measurement.
Control Panel & WiringAt the right hand side of the chamber a control panel will be fixed with all the controls, switches, fuses, contactor assemblies and indicating lamps etc. All the channel type wiring will be as per IS Code for suitable current rated copper wires.
Timer : Timer will be provided in the Chamber for Auto Switch Off of the complete chamber after completion of the selectable test time period.
Other Specifications
Other Features
Standard : IS-9000 (Part XVI)-1983 & JIS D 0203
Size : 1.0 Cubic Meter
Safety Protection
We offer a high grade Dust Chamber to customers in India and overseas. The construction of the Chamber will be such to avoid direct radiation of heat on the test specimen. The floor of the chamber will be so designed as to permit the dust fall in to the hopper for recirculation of supporting specified load of the floor area.
Construction
Heating System For temperature uniformity in the chamber, low surface loading sealed tubular heaters will be provided as per IS 4159. The heaters will be fixed in conditioning space in the chamber duly baffled to avoid direct radiation.
Heat input Controlling : Through Solid State Triac Firing Energy Regulator will control with 0 to 100 % proportional control for heating.
Port Holes Port Holes with suitable Rubber Plugs will be provided to access for Internal Chamber Volume and for connecting wires/pneumatic pipes etc.
Dust Agitating Mechanism
Timer Programmable Weekly Timer will be provided in the Chamber for Auto Switch Off of the complete chamber after completion of the selectable test time period.
Dust Collector : Hopper shaped bottom will be provided to collect agitating dust (approx 3 to 5 kg).
Dust Measuring Device : Dust measuring device will also be provided.
Viewing Window : A viewing window of 30 x 30 cms will be provided on Front Door.
Control Panel
Separate Control Panel on top of the Chamber will be provided with Contactors, On/Off Switches, Fuses, Indicating lamps. The wiring, will be channel type with suitable current rated copper wire as per, IS Code.
Other specifications
Provision of using, either fan or vacuum or both can be used at a time, will be provided.
Safety Protection
Standards
The Equipment will meet requirement :
Instrumentation Solid State Digital Temperature Controller-cum-Indicator will be provided with PT-100 Temperature Thermocouple.