The source water is analyzed on certain parameters and according to the quality of water and level of contamination, we come up with the required treatment plant. Other than engineering and installation consultancy, our consultants also offer...
BASIS OF DESIGN AND CAPACITY OBJECT: To commission a Mineral water plant 3000 liters per hour. ASSUMPTIONS: No. Of working days :360 days No. Of working hours :10-16 hours Capacity utilization :91-95% INPUTS (Raw water Quality): Total Dissolved Solids : < 1500 PPM OUTPUT...