Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    50E PET Advanced Optical Transparent Coating

    ₹ 3.24 Lakh / Ton
    Get Latest Price
    • MOQ1 Ton
    • Brand NameJXHMChemicals
    • Country of OriginChina
    • Supply TypeManufacturer, Exporter, Supplier
    • Preferred Buyer Location All over the world

    Jxhm50e is a pet advanced optical transparent coating with two-component. It mainly is apply to make the connection material of the diffusion film. The coating that adds diffusion power will form a....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 9 Years
    • building Nature of Business Supplier

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details

    Product Details no_img_icon

    Jxhm50e is a pet advanced optical transparent coating with two-component. It mainly is apply to make the connection material of the diffusion film. The coating that adds diffusion power will form a diffusion film coating. It is especially suitable for making the diffusion film for mobile phone, which is not easy to shrink, curl, excellent softness and elasticity.
    Collocation method in order
    main agent ( 10 parts ) + diluent (5 parts ~7 parts ) + diffusion powder(appropriate) and stir completely+ curing agent (1.0 parts ~ 2.0 parts) and stir completely again.
    cautions:
    1. The formulated coating should be used up within 10 hours after it is ready-made. If continuing to use the remain, first mix the remain and the new formulated coating together, and then the mixed coating should not exceed 10 hours. (if exceed, solidification is likely to come out)
    2. Using machine coating, 4 levels of increasing temperatures should be: first stage:60~65℃; second stage:70~75℃; third stage:80~90℃; fourth stage:100~130℃.
    3. Reverse rolling after coating is finished, so that the residual solvent sufficiently volatilizes. Coating speed should be set up according to the coated object sufficiently dries off. (coating speed as reference is 13-15mmin if length of drying tunnel is 10~15m).
    4. Hardening time: after 24 hours at room temperature, then place it into in the solidification room at 45℃~50℃ for 72 hours.
    5. Can’t be mix with other coatings.
    6.to avoid turbidity, please clean up other types of coating, include equipped with plastic tank, plastic buckets and all tools before using the coating.
    7.the process ratio in this paper is for reference only. Due to different manufactures are with different technology conditions, raw material conditions and equipment conditions, we recommend that manufactures confirm the pre-tests or consult with us before using. Our products are only sold according to general condition.


    Additional Information

    • Payment Terms T/T
    • Port of Dispatchguangzhou
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for 50E PET Advanced Optical Transparent Coating?

    Quantity
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice