Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Air Cooling Tunnel

    • Supply TypeManufacturer, Exporter, Supplier
    • Preferred Buyer Location All over the world

    Our Air Cooling Tunnel, made by Hermetel (in year 2004), is especially designed for the purpose of cooling down the ready packed products that are loaded on galvanized steel trolleys, after 40....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 16 Years
    • building Nature of Business Supplier
    • Year of Establishment 2007

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    Our Air Cooling Tunnel, made by Hermetel (in year 2004), is especially designed for the purpose of cooling down the ready packed products that are loaded on galvanized steel trolleys, after 40 Celsius degree to 5 C processing. The complete Air Cooling Tunnel unit was installed in the year 2005 and has never been used. Description Cooling tunnel consist of 19 meters long double tunnel made on polyurethane panels where product trolleys are led through the in-feed and out-feed tunnel with a floor mounted transport conveyor. The conveyor is pneumatically operated via double acting rail with gripping hooks for the trolleys. Loading and unloading of trolleys is from the front of the tunnel and automatic direction change gear will turn trolleys from in-feed line to out-feed line. Totally 31 trolleys fit in the cooling tunnel in one time. Delivery includes 35 brand new galvanized steel trolleys. Hot climate design water chiller with cooling capacity of 107 kW and made by Aermec in 2004 provides cooling of the air cooling system. The water chiller is air-cooled, outdoor type and the cooling transfer media in water glycol solution. Circulation air fan system with a cooling heat exchanger is located on the roof of tunnel, cooling air at temperature of +3 C is directed in reverse product trolley transportation direction and it is circulated in closed loop. The whole unit is controlled with OMRON PLC system with a MMI screen together with microprocessor based control unit of the water chiller. Tunnel takes 31 trolleys with 180 kg product each (totally approx 5600 kg packed product) and cooling from +40 C to +5C will take 20 hours if the product is packed in no thicker that 10 cm packs.


    Technical Specifications

    ManufacturerHermetel, installation year 2005
    Cooling Capacity107 kW / +3C air
    Tunnel MaterialPolyurethane 8 cm panel
    Product Capacity31 x 180 kg/20 hours, no thicker than 10 cm
    Tunnel DimensionsCanal openings 1.8 x 2.0 m
    Width2.8 m
    Lengthapprox. 19 m
    Height requirement4 m
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Air Cooling Tunnel?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice