Contact SupplierThe main principle of flash butt welding:
1.the flash butt process starts when the two workpieces to be welded which are clamped by welding jams still not meet each other.
2.during the subsequence,move the welding jaws together slowly,the welding current density will increase,then the metal material in the gap between the jaws becomes molten,at the same time a shower of sparks also being emitted.
3.as the cross-sectional area in the welding becomes extremely hot,the motion is accelerated.
4.the flashing also makes the surfaces to welded together totally.
5.finally the upset occurs at high pressure,the welding current is cut off.
Typical applications:
1.all kinds of dinnerware,cooking knives and table knives;
2.bicycle rim,motorbike rim,car rim,or similar strip rings;
3.various metal wire and steel strip,construction steel bar and rebar;
4.round,square and rectangular tubes welding into “l” or “t” shape;
5.mitre welding of door and window frames.
Main technical parameter:
parameter rated power rated voltage rated frequency max short current rated duty cycle max clamping force max upsetting force cooling water required average weight
over dimensions l*w*h
model no.
un-50 50kva 380v420v 5060hz 19000a 50% 4000n 2000n 150lh 350kg 100*90*150cm
un-75 75kva 380v420v 5060hz 24000a 50% 6500n 3000n 150lh 450kg 100*90*150cm
un-100 100kva 380v420v 5060hz 28000a 50% 6500n 3000n 150lh 550kg 100*90*150cm
un-150 150kva 380v420v 5060hz 32000a 50% 8500n 4000n 300lh 1200kg 140*100*170cm
un-200 200kva 380v420v 5060hz 37000a 50% 8500n 4000n 300lh 1400kg 140*100*170cm
un-250 250kva 380v420v 5060hz 45000a 50% 12000n 6000n 600lh 1600kg 180*120*190cm
un-300 300kva 380v420v 5060hz 52000a 50% 12000n 6000n 600lh 1800kg 180*120*190cm.