Contact Supplier1.     Straighten and fix the cable, strip the outer sheath at the end of the cable according to the size shown in Figure 1
2.     Keep 60mm copper shield and strip the rest
3.     Keep the semiconducting layer and peel off the rest. Special attention shall be paid to the removal of the semiconducting conductive layer to avoid damaging the core insulation. The semiconducting cut-off position shall be neat, chamfered and polished smooth.
4.     Polish the surface of the insulating layer and fix the shielding bottom line on the copper shielding layer with constant force spring
5.     Wipe the surface of the ground wire core insulator with cleaning paper, apply a layer of silicone grease evenly on the surface of the core insulator after the detergent volatilizes completely, and wrap two layers of semi conducting belt around the semi conducting belt. The semi conducting tape shall be stretched 200% during wrapping, and the insulation of the overlapping core shall be 5mm, and the copper shielding shall be 6mm
Insert the internal force pipe. The lower edge of the stress pipe is 40mm away from the edge of the outer sheath of the cable. Heat the pipe with a small fire to shrink it