Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

Customized Automatic 240 - 320V 50 / 60 Hz caustic recovery plant, Capacity : 65 KLD

Listing ID #2021338

  • Voltage240 - 320V
  • Automatic GradeAutomatic
  • Capacity65 KLD
  • Frequency50 / 60 Hz
  • Supply Type Exporter, Supplier, Retailer
Preferred Buyer From : All over the world
View More Details
Send Enquiry

Company Information

  • Member Since 13 Years
  • Nature of Business Manufacturer
  • Year of Establishment 1995

Ask for more detail from the seller

Contact Supplier

Product Details no_img_icon

  • Voltage 240 - 320V
  • Automatic Grade Automatic
  • Capacity 65 KLD
  • Frequency 50 / 60 Hz
  • Design Customized
  • Power Source: Electric

In such grim situation one has to really start thinking a fresh on various profit making avenues which were being ignored in better times. The ideal way of looking at it is basically looking at points to save wastages of various resources and recover it profitably wherever possible.
Details :
Braj Projects Pvt.Ltd. has a team who have an experience of More then 10 Years in recovery from waste offering various projects such as heat recovery systems ,salt recovery and caustic recovery system / caustic recovery plant
Explanation :
Mercerisers for Textile Mills generate dilute caustic liquor, which if drained to effluent treatment plant, will create considerable problems in meeting the environmental standards. Caustic recovery system / caustic soda recovery plant by concentrating wash liquor and using the same back in Merceriser is the only feasible solution.
Principle :
Under caustic recovery system / caustic soda recovery , Caustic at low concentration is heated to its boiling point with the help of a heat source and the vapors generated due to boiling are used to heat the weak liquor. This hot liquid is then flashed at lower pressure  and the vapors so generated used again. The weak liquor is concentrated to 250-300 GPL as in case of dry Merceriser or 450-500 GPL in case of wet Merceriser which can be reused with a minor topping up of caustic.
Operation :

  • Weak Caustic lye, around 5-6 Be ( 40 - 50 gpl ), is collected from the impregnation and washing chamber  into a storage tank. It is then taken to a filtration unit to filter the suspended solids, fluff etc. The feed to CRP then passes through a series of preheaters which preheat the wash liquor with the help of flash vapors from the condensate flashes ensuring minimum steam loss in heating the Wash liquor to its boiling point.
    The liquor in the tubes comes in contact with the steam in the shell side of heater 1 and the liquor starts boiling. The vapor liquor mixture enters the flash vessel through a tangential entry and the vapors get separated and enter the shell of the 2nd stage.
  • The boiling in the successive effect takes place due to lower pressure created with help of a water ring vacuum pump. Due to lower pressure the boiling point of the liquor is reduced and it starts boiling.
  • The concentrated liquor enters the 2nd heater due to the pressure difference and comes in indirect contact with the generated vapors and the same procedure is repeated. The concentrated product is removed from the last stage by a product pump.This later is taken either to a storage tank or to a Concentrated Lye purification system .
  • Under caustic recovery system / caustic soda recovery plant vapors generated at the last stage need to be condensed. This is done by either HotWateror an Adiabitc Evaporatorsystem. In case of a hot water system, water at room temperature is passed through tubes of an exchanger and it gets hot due to the vapors. This hot water is uncontaminated and hence can safely be used in the process or the boiler as per the requirement.
  • In some cases where the hot water generated cannot be effectively consumed the effluent is passed through the exchanger and sprayed in an Adiabatic Evaporator Here the waste heat is lost in form of vapors and hence effective steam consumption of steam is reduced. Also nuisance of excess hot water is eliminated.


Download


Download Detail File : Click Here
Interested in this product? Ask for more details & Latest Price from seller
Send Enquiry

Company Details close-icon

We give solutions in Energy conservation and Environment projects.
We are Having a Manufacturing Facility at Bangalore for over 30 years.
We make Steam Turbines there.We Make Zero Liquid Discharge Plants also at Ahmedabad,Gujarat ,India.
Our Team consists of About 70 and the group Turnover this Year would be About Rs.25 crores.
We have a vision of Decreasing India's Power Deficit by half in the next 3 years.We have made Special MINI STEAM TURBINES for the same.
  • Nature of Business Manufacturer / Exporter / Supplier / Retailer
  • Number of Employees 50 - 100
  • Year of Establishment 1995
Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

Looking for caustic recovery plant?

Quantity
Seller Contact Details
Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice