Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Ce Certificated Warehouse Steel Platform Racking

    • MOQ1 Set(s)
    • Packaging Typeas request
    • Supply TypeManufacturer
    • Preferred Buyer Location All over the world

    We are offering warehouse steel platform racking.detailed product description steel platform is: 1. Low cost and rapid construction 2. Simple and strong structure 3. Improve utilization of....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 13 Years
    • building Nature of Business Manufacturer
    • Year of Establishment 2007

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    We are offering warehouse steel platform racking.detailed product description
    steel platform is:
    1. Low cost and rapid construction
    2. Simple and strong structure
    3. Improve utilization of warehouse
    steel platform, another storage rack style, takes maximum advantage of the height of premises, doubling or tripling the surface area and enabling it to be fitted out as a storage area, changing room, or offices, etc. The installation of a mezzanine is an ideal solution to maximise the space available by taking advantage of the height of the building. Mezzanine floors are totally dismountable and re-usable, and their structure, dimensions and location are easily modified.
    you will find the mezzanine or platform will be :
    1). Quick to assemble, clean and easy.
    2). Multiplies surface space in industrial premises.
    3). Adaptable to the specific needs of the client, thanks to the great variety of sizes available, types of floors, construction systems, etc.


    Additional Information

    • Payment Terms L/CT/T
    • Port of DispatchNanjing or Shanghai
    • Packaging Details1. Packing in carton clips for beams; 2. Packing in plastic films for uprights; 3. packing in cartons for other accessories.
    • Delivery TimeSteel platform production period is 15days after deposit arrival
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Ce Certificated Warehouse Steel Platform Racking?

    Quantity
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice