Company Information
Ask for more detail from the seller
Contact SupplierWe are offering colored epoxy asphalt pavement. In barrel
in bulk
putting into mixing position from the viewing port
docking asphalt pipeline
viewing port
our company can send engineers to assist successful completion of the construction project, and the quality of project is ensured.
on-site feeding
the docking of mobile equipment and batching plant
scope:
1.road pavement (service life is over 5 years)
cycle path
sidewalk
parking
landscape garden
construction guide
mixing and transport of mixture
construction technology of colored asphalt mixture is similar to that of common asphalt mixture, and attention should be paid to the following:
1. Clean the original feed pipeline of black asphalt and dock the equipment of colored asphalt.
2. Before mixing, mixing tank in the mixing station is washed with hot aggregate several times cleanly.
3. Property of raw material should be stable so that mix proportion of production target can be close to that of design target greatly.
4. Temperature of aggregate is controlled at 170℃-190℃, and heating temperature of asphalt is at 160℃-175℃.
5. Pigment is packed in bag. Pre-calculate the amount of pigment for a jar of mixture before using and open package in advance. After aggregate is put into mixing tank, pigment is added directly. The suggested mixing time is 60s, and actual mixing time depends on the requirements of appearance for asphalt. Asphalt mixture should have performances of even coverage, no gray particle, uniform color, no agglomerate and no isolation phenomena of particle. The quality can meet construction requirement.
6. Vehicles and coverings for transporting mixture should be cleaned in advance.