Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement
    • Packaging Size200ml,400ml
    • Suitable SurfaceConcrete
    • TimingAt Least 4-5 Hours Before the Application of Road Marking Paint
    • AdvantageImproves Bonding
    • Supply TypeManufacturer, Supplier
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 8 Years
    • building Nature of Business Manufacturer
    • gst icon GST No. 33AARFP5765E1ZX

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • Packaging Size200ml,400ml
    • TimingAt Least 4-5 Hours Before the Application of Road Marking Paint
    • AdvantageImproves Bonding
    • Suitable SurfaceConcrete
    • QualityOptimum
    • InstructionEnsure that the road surface is clean, free from dust and moisture.

    Another accompaniment specifically used on concrete surfaces. Recommended to be applied at least 4-5 hours before the application of road marking paint for better bonding and smooth application on Concrete surfaces.
    DIRECTIONS FOR USE

    • Heat the material to 180 - 200°C in the pre - heater with adequate agitation till the material becomes a homogenized liquid.
    • Ensure that the road surface is clean, free from dust and moisture.
    • Heavy deposits of paint require removal.
    • For aged asphalt roads and concrete roads, a primer coat is recommended before 20-30 minutes for proper bonding of the material with the road surface.
    • Ensure that the primer is thoroughly dry and void of solvent prior to application of the thermoplastic material.
    • Ensure temperature of 180 – 200°C and adequate agitation during application.
    • Do not hold thermoplastic above 180°C for more than 6 hours.
    • Do not heat the material above 220°C at any point of time .
    • Change in colour indicates that the material has been scorched owing to overheating and needs to be discarded .
    • Drop - on glass beads must be immediately deposited after thermoplastic application.


    Interested in this product? Ask for more details & Latest Price from seller
    Send Enquiry
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Con Prime?

    Quantity
    Seller Contact Details
    • SellerPrime Roads
    • Address Poonamallee, Chennai, Tamil Nadu
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice