Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Dams Repair Chemicals, Features : Highly Effective, Long Shelf Life, Precise Composition

    • PurityHighly effective, Long shelf life, Precise composition
    • Packaging TypePerma Master Floor (HDM) is available in 10 kg pre weighted units and in bulk.
    • ApplicationIndustrial
    • AdvantagesAbrasion resistant and hard wearing, Slip resistant, High Strength, Easy to handle
    • Composition3 component solvent free epoxy resin based system filled with aggregates.
    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world
    Send Enquiry

    Company Information

    • calendar Member Since 15 Years
    • building Nature of Business Retailer
    • Year of Establishment 1996

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • PurityHighly effective, Long shelf life, Precise composition
    • Packaging TypePerma Master Floor (HDM) is available in 10 kg pre weighted units and in bulk.
    • ApplicationIndustrial
    • Composition3 component solvent free epoxy resin based system filled with aggregates.
    • AdvantagesAbrasion resistant and hard wearing, Slip resistant, High Strength, Easy to handle

    Three Component Heavy Duty Epoxy Concrete for Industrial Floors and Heavy Duty Repairs of Dams, Tunnels and Bridges
    Perma Master Floor (HDM) is a Three Component high performance epoxy resin based concrete that provides a rough looking extremely strong bedding mortar or screed mortar to industrial floors. This product is also used in heavy duty repairs of dams, tunnels, spillways, bridge girders etc.
    Directions for Use

    • Surface preparation - As with all epoxy resin systems, surface preparation is of prime importance. For concrete surfaces, remove all grease, oil, dust, laitance etc. Ensure substrate to receive the screed is sound, cut back to sound surface wherever necessary.
    • Primings - Remove dust and ensure that all the surface is dry. Prime with Perma Master Prime-CN or Perma Master Bond.
    • Mixing - Do not split packs or alter the components in any way. Mix in a suitable mechanical pan type resin mixer. Thoroughly mix both liquid components together prior to the addition of the aggregate component. Remix until the aggregate is completely dispersed.
    • Application - Spread the mixed Perma Master Floor (HDM) onto the primed surface the primer must still be fully tacky. Rake or spread out to the thickness required, compact and finish with a steel trowel.
    • Perma Master Floor (HDM) shall be laid on suitable prepared surfaces where indicated. Perma Master Floor (HDM) is manufactured to the following specifications.


    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Dams Repair Chemicals?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice