Products / Services
  • Products / Services
  • Companies
  • Buy Leads
Post Buy Requirement

Data center

Listing ID #3187225

  • Business Type Service Provider
Preferred Buyer From : All over the world

The determination of cooling requirements for it systems can be reduced to a simple process that can be done by anyone without special training. Expressing all measures of power and cooling in watts....
View More Details
Send Enquiry

Company Information

  • Member Since 7 Years
  • Nature of Business Retailer

Ask for more detail from the seller

Contact Supplier

Service Details no_img_icon

The determination of cooling requirements for it systems can be reduced to a simple process that can be done by anyone without special training. Expressing all measures of power and cooling in watts simplifies the process. A general rule is that a crac system rating must be 1.3 times the anticipated it load rating plus any capacity added for redundancy.
For larger data centers, the cooling requirements alone are typically not sufficient to select an air conditioner. Typically, the effects of other heat sources such as walls and roof, along with recirculation, are significant and must be examined for a particular installation.
The design of the air handling ductwork or raised floor has a significant effect on the overall system performance, and also greatly affects the uniformity of temperature within the data center. The adoption of a simple, standardized, and modular air distribution system architecture, combined with the simple heat load estimation method described, could significantly reduce the engineering requirements for data center design.


Tell us your Buy Requirement to Get Instant Response
Tell us what you need?

Looking for data center?

Quantity
Contact Details
  • Seller Balaji Airvent Systems Private Limited
  • Address Waliv, Thane, Maharashtra
Waiting for permission
To search by voice, go to your browser settings and allow access to microphone

Allow microphone access to search with voice