Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Flexible Scaffolding System, Brand Name : FWK

    • Brand NameFWK
    • Supply TypeManufacturer
    • Preferred Buyer Location All over the world

    We are offering upright scaffold / flexible scaffolding / ring - lock scaffold shoring. detailed product description aluminium scaffolding construction scaffolding shoring systems. upright....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 12 Years
    • building Nature of Business Manufacturer
    • Year of Establishment 2012

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    We are offering upright scaffold / flexible scaffolding / ring - lock scaffold shoring.
    detailed product description
    aluminium scaffolding
    construction scaffolding
    shoring systems.
    upright scaffold flexible scaffolding ring - lock scaffolding system
    description:
    brief introduction
    a convenient scaffolding system, especially for load-bearing support, its structure is simple and reasonable, its operation is easy and flexible, and the system is widely used in industrial buildings and civil buildings.
    competitive advantage
    ①. Product standardization, produce cost is lowered.
    as the picture left shown, the standard is auto-welded; all the distance between cross plates of standards with different length is 500mm, which makes the auto-welded working method be easily achieved.
    ②. Spatial tower assembly guarantees high load-bearing capacity.
    the main body of rl-scaffolding system is consisted of standard, ledger, diagonal ledger, and diagonal brace. The system forms a whole spatial frame structure that guarantees its high load-bearing capacity.
    ③.smart joint design guarantees safe application and easy operation.
    as the picture below shown, the “connect head” stuck in the position of cross plate with correct hole, then fix the pins tightly with a hammer, after that, you finish the whole connection work. The joint is safe and firmly.


    Additional Information

    • Payment Terms L/CT/T
    • Port of Dispatchtianjin
    • Packaging DetailsPackaged stacking, assembly on site according to assembly drawing.
    • Delivery TimeAfter deposit 15-20 days
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Flexible Scaffolding System?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice