
Company Information
Ask for more detail from the seller
Contact SupplierFortFlex 9000 A high performance, epoxy lining designed to cure at low temperatures and exhibit excellent resistance properties to a wide variety of chemicals and corrosives. Maintains flexibility and toughness better than standard epoxies of this class. Exhibits excellent adhesion, sag resistance and corrosion resistance. It is a high 100 % solids, flake filled, premium epoxy coating designed for internal steel and concrete substrates with high impact resistance, superior bonding ability to steel and concrete, resistance to broad range of chemicals.
Uses
Chemicals Resistance
FortFlex 9000 is resistant to a broad range of chemicals such as fuels, salts, alkalies, some solvent, and many acids (including concentrated sulphuric acid).
Surface Preparation
Steel Immediately prior to application of the coating or lining, the steel substrate must be clean of all oil, grease, dirt, mill scale, rust, flash rust, corrosion products, salts solvents, chlorides, other chemicals, and existing coatings.All welds must be smooth and continuous, no skip welds. All weld splatter, buckshot, laminations, and slivers must be removed and ground smooth; undercuts and pinholes must be ground smooth and filled with weld metal. All projections, sharp edges, high points and fillets must be ground smooth to a radius of at least 1/8 in and all corners must be likewise rounded.
All pitting, gouges, scratches, and other defects must be repaired either by welding or by illing with repair materials that are compatible with the coating or lining system and suitable for the intended service conditions. All surfaces to be coated or lined be readily accessible. The steel must be blasted to a minimum near white metal finish (SSPC SP10) with a 100 micron dense, sharp anchor profile free of peening, as measured by ASTM D4417.
Concrete
Immediately prior to application of coating, concrete substrate must be adequately cured (generally, at least 28 days)., structurally sound, free of all dirt, dust, debris, oil, grease, fats, chemical contamination, salts, solvents, surface hardeners, incomplete curing compoundsand foam release agents, laitance and efflorescene. Concrete surface must be dry.Locate all expansion joints, controls joints, floor drains, equipment base plats, and mid-floor termination points. Handle them as per construction details.Concrete is a very porous material. As it warms during the day it expels air, or ‘outgases’. Coating applied while concrete is out gassing will likely develop bubbles and pinholes.To avoid this, the material should be applied when the temperature of the concrete is falling. Usually this is from late afternoon into the night. Stop applying the material well before dawn. So it has time to set up firm to touch before out gassing begins. This may be anywhere from 1-6 hours, depending upon the weather conditons. In addition, it is good idea to shade the work area from direct sunlight. Do not apply material when temperature will fall within 3°C of the dew point.Priming may be required in situations where out gassing could be a problem.
Application
Curing
Safety
Handle with care, before and after use. Follow local safety regulations. All skin contact with resin products should be avoided. Barrier creams should be used and operatives should wear protective clothing for further information please request the Material Safety Data Sheet of this product.