-
Supply Type
Manufacturer, Exporter, Supplier
Preferred Buyer From :
All over the world
Production 2000 to 3000 Pavers Per Shift
1.
Construction
Heavy Duty Steel Construction
2.
Work Station
4 Stations
3.
No. of Cylinders
5 Placed at Right Location
4.
Pressure
48 Tonnes Appx.
5.
Vibration
300 RPM Appx.
6.
Ejection
By Hydraulic Jack
7.
Work Area/Height
300 x 300mm/100m
8.
Stock Time
10 seconds
9.
Electric Motors
2=of 3 & 5 H.P. 1=H.P. Viberation Motor
10.
Power Demand
8.5 H.P3 phase 220V