
Company Information
Ask for more detail from the seller
Contact Supplieraluminum: aluminum 2024 aluminum 5052 aluminum 6061-t6
aluminum 6063 aluminum 7075 aluminum mic 6
stainless steel:200series 300series 400series 500series uns s32101
uns s32304 uns s32003 uns s31803 uns s32205Â
uns s32760 uns s32750 uns s32550 uns s32707 uns s33207Â
steel:12l14 4140 1018 1045 12l14 4130 4142 ,o1 tool steel,
d2 tool steel, a36 1008, alloy42Â
titanium:grades 1-4 grade 5 tc4 ti-6al-4v grade 9Â
ptfe: polytetrafluoroethylene ptfe teflonÂ
acetal: polyoxymethylene pom delrin
pc: polycarbonate
polystyrene: polyether ether ketoneÂ
pa: nylon
pe: uhmw-pe hdpe pet-p
pmma:acrylic
as machined:sharp edge and burrs will be removed
bead blast: the part surface is left with a smooth, matte appearance
anodized: type ii creates a corrosion-resistant finish. Parts can be anodized in different colors—clear,black, red, and gold are most common and is usually associated with aluminum.
type iii is thicker and creates a wear-resistant layer in addition to the corrosion resistance
seen with type ii.
powder coat:
this is a process where powdered paint is sprayed onto a part which is then baked in an oven.
this creates a strong, wear- and corrosion-resistant layer that is more durable than standard
painting methods. A wide variety of colors are available to create the desired aesthetic.
others: such as brushing, polishing electropolishing, spray painting, zinc plating, chrome plating, nickel plating electroless nickel plating, gold plating, black oxide, heat treatment etc.
customized: contact us via email, skype, wechat. We will look into a finishing process for you.
tolerance:according to customer's requirement, normal tolerance is +/-0.05~+/-0.1mm, +/-0.005mm is also can be reached if customer have such high requirement.
lead time:2-3 weeks for samples, 3-5 weeks for mass production
drawing accepted:solid works, pro engineer, auto cad dxf,dwg , pdf, ai
payment terms: trade assurance,tt,paypal,westunion.