Min/Max Tare Weight CheckEnsures filling start on placement of correct drum.
Air Requirement6- 8 bar
Reporting features: 1. Daily Accumulation with No. of containers filled 2. USB Data Transfer: DataVarious reporting feature benefits customer in their day to day operations ensuring daily production data available for factory reporting purposes.
Multiple filling targetsHigh end filling controller capable of storing multiple drum types with set points; ensuring quick changeover of drums.
Platform Roller Ass. [Optional]Single Drum: 600 x 800mm; Multi Drum: 1000 x 1000mm to 2000 x 2000mm Standard: MS / SS; Optional: SS / SS
Data TransferStandard: USBÂ Optional: Data logging Software, Printer, PLC
Jacketing & InsulationLance & Ball Valve: Insulation / Electric Heater / Hot Water Jacket / Steam Jacket
Platform Size & MOCSingle Drum: 600 x 800mm; Multi Drum: 1000 x 1000mm to 2000 x 2000mm Standard: MS / SS; Optional: SS / SS
Resume Filling Function: 1. Power failure 2. Material weight not increasing 3. Emergency Button 4. Air Failure / Air Pressure Drop AlarmIntuitively designed system to ensure auto-judge abnormal behavior due to errors and take corrective actions. Hence, enhancing operators productivity.
Ramp Roller Ass. [Optional]Single Drum: 600 x 800mm; Multi Drum: 1000 x 1000mm to 2000 x 2000mm Standard: MS / SS; Optional: SS / SS
Power Requirement230V AC, 50Hz
Fail Safe ball valveEnsuring protection against spillage or overfill in event of Air failure.
Material Handling [Optional]Non - Motorized & Motorized Roller Conveyors [with or without Traffic Management] Structure: MS Powder coated or Ss304 Rollers: MS Zinc Plated, SS304, SS316
Gas PurgingAvailable with Nitrogen or Steam
Hazardous Area [Optional]Available for Zone 1 IIA/IIB, Zone 2 IIA/IIB, Zone 2 IIC
Product Line Connection RequiredFlexible Product hose 1 ½ " NPT connection standard
Flow Rate displayAssist in Identifying reasons of filling inaccuracy
Auto in-flight CorrectionAuto judgment of in-flight material to reduce overfilling.