For production of hot metal, the unit has installed a blast furnace. In the blast furnace, the burden of iron ore and coke is reduced into hot metal. Coke is used both as reductant and fuel. To maintain heat in the furnace a stove has been set up. A blast furnace of 262 Cu M has also been set up. The production per Cu M is 2.40 tons per day. Considering 340 working days per annum, the installed capacity of the plant is 214,000 TPA. The hot metal produced shall be transferred to Electric Arc Furnace for primary refining or cast in pig casting machine.