Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement
    • Packaging TypeAvailable in Different Colours
    • Polishable> 30 Minutes
    • HardnerDibezoyl Peroxide (1-3%)
    • Complete Curing Time>20 Minutes
    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 12 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    • Packaging TypeAvailable in Different Colours
    • HardnerDibezoyl Peroxide (1-3%)
    • Dry to Touch5-20 Minutes
    • Complete Curing Time>20 Minutes
    • Polishable> 30 Minutes
    • Gel-Time2-6 Minutes

    By using the Marmomastic, there are following stone adhesive advantages.

    • Strong Adhesive Properties
    • Used for bonding
    • Fast Hardening
    • Highly Polishable
    • Quick Drying
    • Quicken Production lines
    • Can be used on vertical surfaces
    Areas of Application

    As a renowned Stone Adhesive Marmomastic is being applied at different areas and stones.

    • Natural Stones
    • Artificial Stones
    • Building Material
    • Travertine
    • Marbles
    • Vertical Surfaces
    • Horizontal Surfaces

     

     Directions

    Surface Preparation
    • Surface to be treated with Marmomastic should be free from dirt, debris, efflorescence and other loose particles.
    • Surface should be cleaned and slightly roughened.
    • Dry the surface before using adhesive.
    Mixture Preparations
      • Empty 100 grams of Part –A to every 1-3 Grams of PART B in a clean container.
      • Stir well to mix completely to get the bonding adhesive.
    Please Note :
    • Mixture once prepared has to be used immediately within 20-30 minutes.
    • Keep the surface highly ventilated during and after the application.
    • Maintain a temperature of 25°C to reduce curing time

     

     

    Quickly run a patch test on a smaller surface to check the hardenning process. Ensure proper ventilation while applying the adhesive

    Application
    • Once the patch test is fine, pour the contents on the sufaceto make the bond the surface. Strike excess material to get a smooth surface.
    • Use standard techniques to work with the adhesive.
    • Wait for 30 mins after the application to polish the treated surface.
    • Maximum hardenning will be achieved only after 7 days of the application.
    • Try and keep the surface warm as it expedites the hardenning process, whereas, cold temperature retards the process.
    LIMITATIONS
    • Stability of the bond is highly dependent on the nature of the natural stone to be bonded.
    • Close container tightly when not in use and do not store the unused material.
    • Patch test recommended. Before applying on a large surface, check product performance on a smaller patch.


    Interested in this product? Ask for more details & Latest Price from seller
    Send Enquiry
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Mmastic?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice