Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Modular Operation Theater

    • MOQ1 Set(s)
    • Supply TypeSupplier, Retailer
    • Preferred Buyer Location All over the world

    The wall and ceiling panel can be made out of following material as per customer requirement in an operation theater. A) 1.6mm thick EGP steel panels backed by 12mm thick Gypsum. B) Stainless steel....
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 14 Years
    • building Nature of Business Retailer
    • Year of Establishment 2008

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    The wall and ceiling panel can be made out of following material as per customer requirement in an operation theater. A) 1.6mm thick EGP steel panels backed by 12mm thick Gypsum. B) Stainless steel SS202 or SS304 panels. C) High-pressure Laminate panels as per EN standard. D) PUF sandwiched panel. The room wall will have two independent surfaces with a minimum opening in between. The external walls of the room will be constructed with solid bricks with cement plastering. The inner surfaces walls will be constructed with 1.60mm thick EGP steel panels backed by 12-mm gypsum board (India gypsum make) these panels will have flame resistance to BS1142 part 3.
    The inner surface walls will be fixed to the bricks wall with essential supports in an modular operation theatre. There will be minimum possible cavity/gap in between the solid and steel walls. The total distance between the inside and outside surfaces of the operating room will be variable to suit the architect’s layout, but will be sufficient for the flush mounting of equipments.The individual wall panels will be spot welded together at equal intervals to render equal support to the panels. Spot welding will be properly grinded to make the surface leveled. All joints will be filled with metal filler and sanded flush on site ready to receive the plastic finish. Wall panel’s joints will be invisible after the final wall coating is applied.Cavity between the inner and outer walls will be left with minimum obstruction for the possible addition of equipment at a later date and to enable services, pipes, conduits etc. toberun within the cavity.Wall mounted equipment will be flush mounted and sealed into theatre.



    Additional Information

    • Payment Terms L/CT/T
    • Delivery Time30Days
    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Modular Operation Theater?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice