
Company Information
Ask for more detail from the seller
Contact SupplierGrade: Blended Pond Ash
Usage/Application: Fly Ash Bricks
Brand: Thermal power plant by product After Coal Burnt in thermal power plant liquid slurry will be sent to pond for storage or draying purpose. Almost Pond ash is coarse and wet in condition, it needs 2-3 days for dry. This as can be used milling for Cement manufacture and fixing for Bricks manufacturer, After Dry Pond ash will be in white color.
Additional Information:
• Production Capacity: 1500 MT/Day
• Delivery Time: Usually Delivers in 12 to 48 hours
• Packaging Details: Pond or Bed Ash will be loaded into tructs in loose form, almost Bed/Pond/Bottom Ash is in wet condition.