Products / Services
  • Products / Services
  • Companies
  • Buy Leads
    Post Buy Requirement

    Pre Engineered Building System

    • Supply TypeManufacturer, Exporter, Supplier, Retailer
    • Preferred Buyer Location All over the world

      Gaytri is one of the front runners in building products viz. Pre-Engineered Building, Roofing & Cladding Systems and we also offers General Engineering Solutions. The combination of proven technology and service driven ethics at Gaytri Building Products began 3 years ago. Since then due to its commitment, today Gaytri is offering a diverse portfolio of products and services. The company has an impeccable talent pool with its presence in all the important market segments in building industry. Gaytri is certified as ISO 9001: 2008 for its quality.
    View More Details
    Send Enquiry

    Company Information

    • calendar Member Since 7 Years
    • building Nature of Business Retailer

    Ask for more detail from the seller

    Contact Supplier
    Report incorrect details
    • Product Details

    • Company Details

    no_img_icon

    ParametersPre-Engineered Buildings (PEBs)Traditional Buildings
    DesignPEBs are largely formed of sections and connections which are standard, due to which time gets considerably reduced.Each conventional steel structure is designed from scratch with very less design support available to the Engineer, hence increasing the operational time.
    DeliveryDelivery time is 6 to 8 weeks on an average.Delivery time is 20 to 26 weeks on an average.
    FoundationsThe design of PEBs is rather simpler and easy to construct. PEBs are also light in weight.Conventional buildings are complex and they possess heavy foundations.
    Eraction Cost & TimeCost & erection time is very less. The erection process is simple, quick, it is constructed bit by bit and with barely any need for equipments.Characteristically, they are 20% more expensive than PEB. Mostly, the erection cost and time is never estimated accurately in these buildings, construction which leads to time lag. 
    More so erection process is slow and complex and lot of field labor is required along with heavy equipment.
    ArchitectureExceptional architectural design can be achieved along with interface details.Particular architectural design and features are required to be developed which often require extensive research resulting in much higher costs and time.
    Future Expansion & RelocationPEB Building is designed with future expansion in mind.Future expansion would be more complex and probably more costlier.

    Share your requirements for a quick response!
    Tell us what you need?

    Looking for Pre Engineered Building System?

    Quantity
    Seller Contact Details
    To list your productBoost Your Business Visibility WorldwideRegister Now
    To list your productBoost Your Business Visibility WorldwideRegister Now
    Waiting for permission
    To search by voice, go to your browser settings and allow access to microphone

    Allow microphone access to search with voice