Molecular sieve: CMS-240, service life ≥ 10 years under proper pre-treatment.
Pre-treatment: Refrigerated or desiccant air dryer, high-efficiency oil-removal filter, activated-carbon tower; oil ≤ 0.003 ppm, particle ≤ 0.01 µm.
Design: Skid-mounted, no foundation bolts; inlet/outlet flanged, 220 V/380 V/415 V, 50 Hz/60 Hz.
Certificates: CE, ISO 9001/14001/45001, pressure vessel ASME U-stamp optional.
Typical industries: food & beverage (blanketing, flushing), electronics (lead-free soldering, wafer process), pharma (API drying, glove boxes), heat treatment (furnace atmosphere), laser cutting (assist gas < 99.9 %), chemical tank blanketing, offshore platforms, mines, etc.
Delivery: 15 – 20 working days after deposit; plywood case export package, IPPC-free.
Warranty: 18 months on whole unit, 10 years on carbon molecular sieve if genuine GESO pre-treatment is used.
Service: 200 + service centres worldwide, 24 h hotline, spare parts ex-stock within 3 days.
Choose GESO PSA nitrogen systems for lower lifetime cost, higher reliability and instant on-site availability.
Additional Information
Payment Terms T/T
Port of DispatchQingdao, China
Packaging DetailsPacking Method a. Split-case packing: Main unit, vessels, electric cabinet, dryer & filter skid, spare-parts box packed separately. Each case internally braced with timber or steel straps to prevent movement. b. Shrink-wrapped bare skid: Oversize skids shipped naked but fully wrapped in UV-stable, waterproof PE film + orange warning tape; top hood added for sea spray protection. c. Full-container load (FCL): Factory secures skid to container floor with welded stoppers and 8-mm steel lashing; container loading drawing supplied. Shipping Marks (GB/T 191, GB/T 13384, ISO 780) Consignee & consignor name, address, phone
Delivery Time15–20 working days after 30 % T/T deposit
Interested in this product? Ask for more details & Latest Price from seller