
Company Information
Ask for more detail from the seller
Contact SupplierFeatures
1. The mixer is settled together with the tower of RAP system, changed the traditional heating mode of reclaimed materials, new structure design, virgin asphalt integrated with the recycled asphalt together, high add ratio for recycled asphalt, high capacity performance.
2. Special sized dryer drum blades can prevent adhesive aggregate, make the production stable and efficient, easy to maintenance.
3. The high temperature exhaust gas returned to dryer drum through the flute to refuse which can save energy while reducing the burden of dust collection equipment.
4. The old aggregate adding rate can reach up to 30%-80% through this method.