Listing ID #3959550
Company Information
Ask for more detail from the seller
Contact SupplierDetails :
Characteristics :
Handling and Operation :
Installation : As with all flow meters, if possible the turbine should be installed ahead of a valve (on the pressure side). Good degassing should be ensured. 10 x D calming sections are recommended before and after the turbine in order to maintain the specified accuracies. The turbine should be filled with fluid at all times. The electronics housing does not project into the flow space.
Options :
Accessories :